Need Overview
Need Name:
Replace Runway Lighting
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Apply Runway Friction Course
Construct Runway
Construct Runway Safety Area [Non-Primary Airports]
Construct Runway Safety Area [Primary Airports]
Expand Surfaces
Extend Runway
Extend Runway Safety Area
Groove Runway
Improve Runway Safety Area
Install Instrument Approach Aid
Install Runway Distance-To-Go Signs
Install Runway Lighting
Install Runway Sensors
Install Runway Vertical/Visual Guidance System
Rehabilitate Runway
Rehabilitate Runway Lighting
Relocate Approach Lighting
Relocate NAVAID
Repair NAVAID
Shift Runway
Strengthen Runway
Widen Runway
Estimated Cost:
$843,000
Description:
Rehabilitate runway, taxiway, apron, and access road. Repair soft spots in the embankment. Apply dust palliative. Replace the lighting system. Clear vegetation from the runway, taxiway, and apron fore slopes.
Priority:
Short
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The gravel surface course is in poor condition and failing. Poor drainage and settlement has caused rutting, dips, and cracks resulting in erosion and ponding. Frost heaves have caused shoulder erosion and subsidence. There is differential settlement between the taxiway and apron. The project will resurface the operational surfaces with CASC; remove and replace existing lighting system; and apply a dust palliative to the surface course.
Notes:
Last Edit Date:
3/9/2022 12:38 PM
History Log
Philana Miles
In Project
9/29/2020 10:03 AM
Philana Miles
Need Created
9/29/2020 10:45 AM
Removed from project.
Philana Miles
In Project
9/29/2020 12:24 PM
Philana Miles
Need Created
9/29/2020 01:34 PM
Removed from project.
Philana Miles
In Project
9/29/2020 01:47 PM
Philana Miles
Need Created
3/9/2022 12:30 PM
Removed from project.
Philana Miles
In Project
3/9/2022 12:40 PM