Need Overview
Need Name:
Rehabilitate Apron
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Construct Apron
Construct Blast Pad
Construct Hard Stands
Demolish Apron
Expand Apron
Install Apron Lighting
Rehabilitate Apron
Relocate Apron
Strengthen Apron
Estimated Cost:
$1,231,704
Description:
Rehabilitate the runway, taxiway, safety areas, apron, and airport access road. Reconstruct the RW and TW lighting, rotating beacon, segmented circle, lighted wind cone, and replace signs. Expand the apron to accommodate installation of a new triple-bay SREB under a separate APEB nomination. Construct drainage improvements, replace the culverts along the access road, including a large diameter culvert, and adjust the access road profile so it no longer penetrates the Part 77 surface.
Priority:
Short
Need Origination:
Other
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The community is located on Nunivak Island and the airport is the only year round access. The airport surfaces are in poor condition and the surface course is missing entirely in some areas. The lighting system is failing and is beyond its service life and needs replacement. The airport access road is in poor condition and needs to be rehabilitated to preserve function. A section of the airport access road is subject to seasonal flooding prohibiting access to the airport, a large diameter culvert at this location will be replaced along with raising a section of the access road to address drainage issues. This project will improve safety, airfield operations, and maintenance operations.
Notes:
2/2020 CIP Datasheet