Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

Need Overview

Need Name: Erosion Protection
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $3,182,700
Description: Rehabilitate airfield operational surfaces (runway, taxiway, and apron), extend the partial parallel taxiway to the full runway length, obstruction removal, and provide erosion protection
Priority: Short
Need Origination: Other
Justification: Heavy maintenance is needed at this airport, as well as extending the partial parallel taxiway to a full parallel taxiway. Erosion protection is needed at several points along Glacier Creek to protect the RSA and runway. The last major project was rehabilitating the runway and was awarded in 2002. A surface maintenance grant was awarded in 2006 for runway surface preservation.
Notes: 12/31/2019 CIP Datasheet
Last Edit Date: 7/14/2022 10:04 AM
History Log