Need Overview
Need Name:
Rehabilitate apron
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
M&O Operating
Stimulus
N/A
Category:
Select One
Access Road
Airfield
Airport Master Planning
Airside
Apron
ARPA
Building
Building and Equipment (Control Tower)
CARES Act
CRRSA Act
Equipment
Financing
Ground Transportation
Helipad/Heliport
Homes
Land
Landside
Metro Area Planning
Multi Modal
New Airport
Noise
Other
People Mover
Planning
Privatization Planning
Public Building
Rail
Revenue Producing
Runway
Sealane
Seaplane Base
Service/Perimeter Road
State Block Grant Program
State/Regional Planning
Taxilane
Taxiway
Terminal
Sub Category:
Select One
Construct Taxiway
Construct Taxiway
Construct Taxiway
Construct Taxiway
Extend Taxiway
Extend Taxiway
Extend Taxiway
Install Taxiway Lighting
Install Taxiway Lighting
Install Taxiway Lighting
Install Taxiway Lighting
Install Taxiway Sensors
Install Taxiway Sensors
Reconstruct Taxiway
Reconstruct Taxiway Lighting
Rehabilitate Taxiway
Rehabilitate Taxiway
Rehabilitate Taxiway Lighting
Rehabilitate Taxiway Lighting
Rehabilitate taxiway signage/markings
Remove Taxiway
Replace Taxiway Marking and Signage
Seal Taxiway Pavement Surface/Pavement Joints
Shift or Reconfigure Existing Taxiway
Strengthen Taxiway
Strengthen Taxiway
Widen Taxiway
Widen Taxiway
Estimated Cost:
$5,150,000
Description:
Mill and pave the east side of the apron apron in 2023. Also mill and pave the concrete pad on the north side of the apron.
Priority:
Short
Need Origination:
Community
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
In 2023 the apron pavement will be 20 years old and will need a new mill and pave. A 2013 and 2014 LOC Letter cited ponding water on the apron and the need to repave. The north side concrete pad has differential shifting, which is causing damage to snow removal equipment and stressing aircraft landing gear. Shifting is also causing potential loss of aircraft directional control.
Notes:
This project should be bundled with an apron drainage rebuild project.
Last Edit Date:
2/1/2021 10:58 AM
History Log
SWA Update
Need Created
2/1/2021 10:58 AM
Removed from project.
SWA Update
In Project
2/1/2021 10:59 AM