Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Napaskiak 2 Bay SRE Building
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
M&O Operating
Stimulus
N/A
Category:
Select One
Access Road
Airfield
Airport Master Planning
Airside
Apron
ARPA
Building
Building and Equipment (Control Tower)
CARES Act
CRRSA Act
Equipment
Financing
Ground Transportation
Helipad/Heliport
Homes
Land
Landside
Metro Area Planning
Multi Modal
New Airport
Noise
Other
People Mover
Planning
Privatization Planning
Public Building
Rail
Revenue Producing
Runway
Sealane
Seaplane Base
Service/Perimeter Road
State Block Grant Program
State/Regional Planning
Taxilane
Taxiway
Terminal
Sub Category:
Select One
Estimated Cost:
$3,511,579
Description:
Project will construct a new heated, 2-bay SRE building, Electrical Enclosure Building, Electrical Lighting Vault and Transformer Replacement. Remove current SRE buildings that are beyond their useful life.
Priority:
Mid
Need Origination:
Other
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The existing 1-bay SRE, built in 1992, is not adequate to protect the airport's equipment. The Equipment Storage building contains the equipment fuel tank. The existing building is in very poor condition with multiple patch style repairs. It is no longer properly insulated and one of the bay doors is not able to be opened either mechanically or manually.
Notes:
Per 2021 CIMP.
Last Edit Date:
1/24/2022 01:31 PM
History Log