Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

Need Overview

Need Name: Pavement Rehab and Resurface - Stage 1
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $22,866,000
Description: Rehabilitate the main runway, including the safety areas, TW B south; remove pavement on TW D; resurface GA Apron; and resurface pavement on TW A. Remove berm from 20:1 approach and 7:1 transitional surfaces, install an Access Control System for increased security, replace airfield lighting and fencing, and build an airport perimeter access road.
Priority: Mid
Need Origination: Inspection
Justification: Pavement deficiencies are serious and beyond scope of M&O CIMP and PMI confirm this.
Notes: The purpose of the project is to extend the service life of the runway, taxiway b (south), taxiway A, and the GA apron.
Last Edit Date: 2/22/2021 09:10 PM
History Log
SWA Update
Need Created
2/22/2021 09:05 PM
Removed from project.
SWA Update
In Project
2/22/2021 09:12 PM

Inspection Photos