Need Overview
Need Name:
Gambell SREB
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
M&O Operating
Stimulus
N/A
Category:
Select One
Access Road
Airfield
Airport Master Planning
Airside
Apron
ARPA
Building
Building and Equipment (Control Tower)
CARES Act
CRRSA Act
Equipment
Financing
Ground Transportation
Helipad/Heliport
Homes
Land
Landside
Metro Area Planning
Multi Modal
New Airport
Noise
Other
People Mover
Planning
Privatization Planning
Public Building
Rail
Revenue Producing
Runway
Sealane
Seaplane Base
Service/Perimeter Road
State Block Grant Program
State/Regional Planning
Taxilane
Taxiway
Terminal
Sub Category:
Select One
Estimated Cost:
$2,344,589
Description:
Construct a new Snow Removal Equipment Building (SREB) at the Gambell Airport. Replace the airport lighting electrical enclosure building and rotating beacon.
Priority:
Mid
Need Origination:
Other
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The Gambell rehabilitation project is a Western District SREB 2017 Upgrade #1 priority. This wood framed building was built in 1999. The interior building needs include a concrete floor, LED lighting, interior paint, and a new heating system. The exterior needs include an overhead door, new siding or painting, and new fuel tanks with security fencing around the tanks. A new EE (electrical equipment) room is being constructed with the current Gambell Airport Pavement Rehabilitation and Lighting Replacement project. A CIMP inspection has not been completed at the Gambell airport and will be scheduled after construction of the upcoming Airport Pavement Rehabilitation and Lighting Replacement project is substantially concluded.
Notes:
For Spending Plan
Last Edit Date:
3/15/2019 01:59 PM