Need Overview

Need Name: Construct 2-bay SREB
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $3,321,890
Description: Replace existing Snow Removal Equipment Building (SREB) with a double bay SREB.
Priority: Short
Need Origination: Other
Justification: The SREB was constructed in 1979. It is in very poor condition and was rated as “F” in the 2018 CIMP inspection. There is a dirt floor and the man doors have large gaps allowing significant air and water leakage. The Snow Removal Equipment Building (SREB) will be replaced with a double bay SREB to house the two AIP funded pieces of equipment.
Notes: Previous APEB Score 52 - Demolish existing 1-bay SREB, Construct a new 2-bay heated SREB with floor. In AIP Spending Plan >FFY 2018
Last Edit Date: 3/1/2021 05:26 PM
History Log
Philana Miles
In Project
3/16/2021 10:07 AM