Need Overview
Need Name:
Construct 2-bay SREB
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Handicap Passenger Lift Device
Construct ARFF Building
Construct Building
Construct Passenger Shelter
Construct Sand and Chemical Storage Building
Construct SREB
Construct Terminal Building
Construct Toilet Facilities
Demolish Building
Expand ARFF Building
Expand Building
Expand Sand and Chemical Storage Building
Expand SREB
Expand Terminal Building
Hazmat Removal
Improve ARFF Building
Improve Building
Improve Sand and Chemical Storage Building
Improve SREB
Improve Terminal Building
Modify ARFF Building
Modify Building
Modify Sand and Chemical Storage Building
Modify SREB
Rehabilitate ARFF Building
Rehabilitate Building
Rehabilitate Sand and Chemical Storage Building
Rehabilitate SREB
Relocate Building
Estimated Cost:
$3,321,890
Description:
Replace existing Snow Removal Equipment Building (SREB) with a double bay SREB.
Priority:
Short
Need Origination:
Other
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The SREB was constructed in 1979. It is in very poor condition and was rated as âFâ in the 2018 CIMP inspection. There is a dirt floor and the man doors have large gaps allowing significant air and water leakage. The Snow Removal Equipment Building (SREB) will be replaced with a double bay SREB to house the two AIP funded pieces of equipment.
Notes:
Previous APEB Score 52 - Demolish existing 1-bay SREB, Construct a new 2-bay heated SREB with floor. In AIP Spending Plan >FFY 2018
Last Edit Date:
3/1/2021 05:26 PM
History Log
Philana Miles
In Project
3/16/2021 10:07 AM