Need Overview
Need Name:
SREB & Sand Storage Building
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Handicap Passenger Lift Device
Construct ARFF Building
Construct Building
Construct Passenger Shelter
Construct Sand and Chemical Storage Building
Construct SREB
Construct Terminal Building
Construct Toilet Facilities
Demolish Building
Expand ARFF Building
Expand Building
Expand Sand and Chemical Storage Building
Expand SREB
Expand Terminal Building
Hazmat Removal
Improve ARFF Building
Improve Building
Improve Sand and Chemical Storage Building
Improve SREB
Improve Terminal Building
Modify ARFF Building
Modify Building
Modify Sand and Chemical Storage Building
Modify SREB
Rehabilitate ARFF Building
Rehabilitate Building
Rehabilitate Sand and Chemical Storage Building
Rehabilitate SREB
Relocate Building
Estimated Cost:
$4,635,000
Description:
Demo existing SREB and sand storage structure. Construct 3 bay heated SREB, regulator building, and sand storage.
Priority:
Mid
Need Origination:
Other
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
·Equipment storage is insufficient for equipment. The Grader cannot fit in the current building and more equipment is on order. Per grant assurances to the FAA, this equipment must be stored inside. A Standard 3 bay SREB is needed. ·Current sand storage condition is poor, sand gets wet and building is near end of usuable life. Seward gets a lot of water on the airport so new design should allow for water to escape storage area and sand to dry.
Notes:
Last Edit Date:
3/3/2023 11:22 AM
History Log
Rebecca Douglas
Need Created
3/3/2023 11:21 AM
Removed from project.
Rebecca Douglas
In Project
3/3/2023 11:22 AM