Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Survey of Airport Property Boundary
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Easement For Approaches
Acquire Easement for Development
Acquire Easement for Noise Compatibility
Acquire Land For Approaches
Acquire Land for Development
Acquire Land for Noise Compatibility
Acquire Miscellaneous Land
Conduct Aeronautical Survey
Conduct Aeronautical Survey for WAAS Approach
Conduct Airport Master Plan Study
Conduct ALP Update
Conduct Environmental Study
Conduct Ground Transportation Study
Conduct Metropolitan System Plan Study
Conduct Miscellaneous Study
Conduct Noise Compatibility Plan Study
Conduct State System Plan Study
Conduct Vertiport Plan
Construct New ALP
Environmental Action
Identify the Airport's Environmental Footprint
Noise Mitigation Measures
Noise Mitigation Measures for Public Buildings
Noise Mitigation Measures for Residences
Obstruction Survey
Obtain Wind Data
Prepare SMS Manual and Implementation Plan
Resolve Right of Way Issues
Update Airport Master Plan Study
Update Metropolitan System Plan Study
Update Miscellaneous Study
Update State System Plan Study
Wildlife Control
Wildlife Hazard Assessments
Estimated Cost:
$309,000
Description:
Airport is NOT federally obligated and 2002 property map indicates right of way and ownership issues. There is not a current, full survey for this airport, and one would need to be done before any future work can be completed.
Priority:
ASAP
Need Origination:
Sponsor
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Notes:
Last Edit Date:
8/9/2023 03:02 PM
History Log