Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Rehabilitate runway, taxiway, and apron surfaces
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
M&O Operating
Stimulus
N/A
Category:
Select One
Access Road
Airfield
Airport Master Planning
Airside
Apron
ARPA
Building
Building and Equipment (Control Tower)
CARES Act
CRRSA Act
Equipment
Financing
Ground Transportation
Helipad/Heliport
Homes
Land
Landside
Metro Area Planning
Multi Modal
New Airport
Noise
Other
People Mover
Planning
Privatization Planning
Public Building
Rail
Revenue Producing
Runway
Sealane
Seaplane Base
Service/Perimeter Road
State Block Grant Program
State/Regional Planning
Taxilane
Taxiway
Terminal
Sub Category:
Select One
Estimated Cost:
$0
Description:
Rehabilitate runway, taxiway, and apron surfaces. Project currently in Spending Plan.
Priority:
N/A
Need Origination:
Other
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Numerous humps and dips with 4 to 6 inch full length. Extensive ponding on runway and ramp.
Notes:
from Darrel John, kwigtribe@gmail.com, 1. Erosion on the south end of the airport runway. 2. Runway level - needs to be maintained. 3. Length of the runway is to what seems like getting short due to erosion occurring at the south end of the runway, with the edition of getting narrow.
Last Edit Date:
9/4/2018 07:19 AM
History Log
SWA Update
In Project
2/12/2021 10:01 AM