Need Overview
Need Name:
Rehabilitate Apron
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Construct Apron
Construct Blast Pad
Construct Hard Stands
Demolish Apron
Expand Apron
Install Apron Lighting
Rehabilitate Apron
Relocate Apron
Strengthen Apron
Estimated Cost:
$3,205,051
Description:
Rehabilitate the main apron to reconcile drainage issues.
Priority:
Short
Need Origination:
ALP/Master Plan
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The main apron is not currently graded to drain to the existing storm drain system. Moving the storm drain to the low point or changing the apron grading will allow the apron to drain properly and reduce standing water and ice buildup.
Notes:
RE, AP, IM
Last Edit Date:
10/5/2023 02:40 PM