Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Construct 780' Runway Extension
Type:
AIP/M&O AIP
Community/Economic Development
Quality of Life Activity:
Select One
Additional Lease Lots
Aircraft Tie-downs
Broadband or Cellular Service
Economic Development
FAA Weather Camera
Fuel
Passenger Waiting Shelter
Public Restrooms
UAS Integration
Vehicle Parking
Weather Reporting Equipment
Required
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Estimated Cost:
Description:
Construct a 780-foot gravel runway extension
Priority:
Long
Need Origination:
Community
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Notes:
Noted by Mayor Richard Tuluk cityofchevak_mayor@yahoo.com (summer of 2018): Most important issue we are trying to address is extending our runway to 4,000 ft so that larger aircrafts can land and takeoff safely as Chevak was designated by the U.S. Postal Service to serve as a community Hub for seven (7) communities to provide the delivery and distribution of By- Pass Mail and Freight.
Last Edit Date:
9/13/2023 02:25 PM
History Log