Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

JUNEAU INTL: AIP Grants

Owner: CITY OF JUNEAU
NPIAS: 02-0133
Airport Use: Public
Type: Airport
FAA Associated City: JUNEAU
DOT&PF Region: ---
DOT Owned: False
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 93
Total Number of Grant Work Codes: 146 Total Grants: $288,161,416.00
Total Number of Open Grant Work Codes: 33 Total Open Grants: $129,103,632.00
Total Number of Closed Grant Work Codes: 113 Total Closed Grants: $159,057,784.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2023 3-02-0133-094-2023 CV LS DV CARES Landside Project $10,454,010
2023 3-02-0133-095-2023 ST TE IM Improve/Modify/Rehabilitate Terminal Building $1,469,716
2023 3-02-0133-098-2023 ST TE IM Improve/Modify/Rehabilitate Terminal Building $1,795,266
2023 3-02-0133-099-2023 CV AS DV CARES Airside Project $670,426
2023 3-02-0133-100-2023 CA AP CO Construct Apron $4,389,615
2023 3-02-0133-100-2023 RE AP IM Rehabilitate Apron $11,217,573
2022 3-02-0133-089-2022 CV RG SC Small Concessions 1/3/2022 $314,710
2022 3-02-0133-089-2022 CV RG LC Large Concessions 1/3/2022 $78,677
2022 3-02-0133-091-2022 RE AP IM Rehabilitate Apron 9/8/2022 $1,775,151
2022 3-02-0133-091-2022 CA AP CO Construct Apron 9/8/2022 $377,256
2022 3-02-0133-092-2022 ST TE IM Improve/Modify/Rehabilitate Terminal Building 8/3/2022 $187,442
2022 3-02-0133-093-2022 RE AR IM Rehabilitate Access Road 9/8/2022 $2,254,418
2021 3-02-0133-084-2021 CV CR GN CRRSA Act Funds 3/3/2021 $3,324,451
2021 3-02-0133-085-2021 CV CR CN CRRSA Act Concessions 3/3/2021 $98,347
2021 3-02-0133-087-2021 CV RG GN General ARPA 8/17/2021 $5,430,992
2020 3-02-0133-081-2020 RC TE IM Reconstruct Terminal Building 9/24/2020 $8,010,825
2020 3-02-0133-083-2020 RC TE IM Reconstruct Terminal Building 9/24/2020 $6,419,440
2020 3-02-0133-082-2020 CV CA RE CARES Act Funds 4/28/2020 $0
2019 3-02-0133-080-2019 ST EQ LI Acquire Emergency Generator Acquire emergency generator 9/27/2019 $120,000
2019 3-02-0133-080-2019 ST TW CO Construct Taxiway Construct TW D1 to correct RIM point JNU-1 9/27/2019 $1,500,000
2019 3-02-0133-080-2019 RE TW IM Rehabilitate Taxiway Rehabilitate TW-A, -- Phase III construct --         linear feet of TW Rehabilitated. 9/27/2019 $21,782,903
2019 3-02-0133-080-2019 RE TW IM Rehabilitate Taxiway Rehabilitate TW-E to correct problematic airport geometry 9/27/2019 $2,000,000
2018 3-02-0133-078-2018 RC TE IM Reconstruct Terminal Building Design -- North Terminal design -- infrastructure installed prior to 1994 9/19/2018 10/29/2020 $634,735
2018 3-02-0133-076-2018 ST TE IM Improve Terminal Building Add passenger boarding bridge to Gate 2 to support change in aircraft fleet. 6/27/2018 3/6/2020 $1,801,875
2018 3-02-0133-077-2018 ST BD SN Construct Sand and Chemical Storage Building SREF - Sand and Chemical Storage - Phase 1 Design 8/30/2018 $529,688
2018 3-02-0133-079-2018 ST BD SN Construct Sand and Chemical Storage Building SREF - Sand and chemical storage building - Ph. 2 Construct 9/24/2018 $9,985,312
2017 3-02-0133-073-2017 CA AP CO Construct Apron Construct 25,000 sq yd public use apron in NE quadrant on fill placed during RSA construction. 9/20/2017 $6,428,872
2017 3-02-0133-073-2017 CA AP CO Construct Apron Construct NW Apron, Phase II, construct 12,800 sq yd of useable apron over the geothermal loop field constructed in 2016 9/20/2017 $3,696,128
2017 3-02-0133-074-2017 ST EQ SN Acquire Snow Removal Equipment Replace SRE 9/22/2017 $4,823,551
2017 3-02-0133-072-2017 ST SB CO Improve Seaplane Base Improve float pond - place armor rock, install control valve to outlet to mitigate erosion effects inherent in use. 9/14/2017 $765,000
2017 3-02-0133-075-2017 EN EQ MS Energy Efficiency Equipment/Infrastructure Replace metal halide apron lighting with high efficiency LED lighting. 9/20/2017 $240,000
2017 3-02-0133-071-2017 RE TW IM Rehabilitate Taxiway Design TW D/D1 to address RIM point JNU-1 -- Design only, following results of 2016 planning/enviro grant #068 9/7/2017 $100,000
2017 3-02-0133-071-2017 RE TW IM Rehabilitate Taxiway Design TW-A, C, & E rehab and realignment to rehab TW-A and address problematic airport geometry -- Phase II - design only following grant #068 for planning and alternatives selection 9/7/2017 $1,879,062
2016 3-02-0133-068-2016 RE TW IM Rehabilitate Taxiway TW-A, C, D, and E planning, preliminary design, and NEPA to support TW A rehab and RIM program 9/13/2016 10/11/2018 $656,250
2016 3-02-0133-065-2016 SA BD EX Expand Aircraft Rescue & Fire Fighting Building Construct ARFF Building extension 7/28/2016 3/13/2020 $2,200,312
2016 3-02-0133-066-2016 CA AP CO Construct Apron Construct public use aprons in NW and NE quadrants 9/21/2016 4/5/2019 $2,701,054
2016 3-02-0133-067-2016 ST BD SN Construct Snow Removal Equipment Building Construct SREB 9/19/2016 $13,694,036
2016 3-02-0133-067-2016 ST BD SN Construct Snow Removal Equipment Building Geothermal loop field 9/19/2016 $3,290,765
2015 3-02-0133-064-2015 ST AP CO Construct Apron Design NE Apron and South Fence - Phase 1 Design 9/1/2015 2/8/2019 $753,786
2015 3-02-0133-063-2015 EN PL MA Conduct Environmental Study Preliminary Engineering/Design Analysis and Environmental Study of Proposed ARFF Building Expansion 8/21/2015 11/20/2017 $234,375
2015 3-02-0133-062-2015 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire ARFF vehicle. 8/21/2015 11/21/2016 $629,741
2015 3-02-0133-061-2015 ST TE MS Acquire Handicap Passenger Lift Device 7/15/2015 11/3/2016 $59,863
2015 3-02-0133-064-2015 ST EQ SE Install Perimeter Fencing 9/1/2015 2/8/2019 $32,551
2015 3-02-0133-061-2015 ST TE IM Rehabilitate Terminal Building Replace passenger boarding bridge -- reimbursement for sponsor purchase. 7/15/2015 11/3/2016 $466,270
2014 3-02-0133-060-2014 RE RW IM Rehabilitate Runway 08/26 Phase 2 7/1/2014 5/24/2018 $20,239,669
2013 3-02-0133-058-2013 RE RW IM Rehabilitate Runway 08/26 Phase 1, Design 9/12/2013 7/5/2017 $1,171,875
2013 3-02-0133-059-2013 EN PL ES Sustainable Master Plan Sustainable Master Plan 9/19/2013 5/17/2018 $250,000
2013 3-02-0133-059-2013 PL PL MA Update Airport Master Plan Study Master Plan update. 9/19/2013 5/17/2018 $453,125
2013 3-02-0133-057-2013 SA RW SF Construct Runway Safety Area 08/26 Final funding of ATO Reimbursable Agreement to complete NAVAIDS installation 6/17/2013 12/10/2015 $1,903,817
2012 3-02-0133-055-2012 SA RW SF Construct Runway Safety Area 08/26 Phase 7 7/18/2012 7/7/2017 $17,185,007
2012 3-02-0133-056-2012 SA RW SF Construct Runway Safety Area 08/26 Phase 8 (ATO reimbursable agreement) 9/19/2012 12/23/2014 $5,500,000
2011 3-02-0133-052-2011 SA RW SF Construct Runway Safety Area 08/26 phase 4 (Design & Construction) 6/20/2011 12/10/2015 $4,509,960
2011 3-02-0133-053-2011 SA RW SF Construct Runway Safety Area 08/26 phase 5 (ATO RA) 6/17/2011 7/12/2016 $1,961,661
2011 3-02-0133-054-2011 SA RW SF Construct Runway Safety Area 08/26 Phase 6 (construction) 9/15/2011 10/27/2016 $6,576,061
2011 3-02-0133-051-2011 ST BD SN Construct Snow Removal Equipment Building phase 2 (utilities) - Part A 3/15/2011 11/16/2016 $849,971
2009 3-02-0133-050-2009 ST BD SN Construct Snow Removal Equipment Building Construct SREF Embankment, phase 1 8/24/2009 7/12/2016 $1,000,000
2009 3-02-0133-050-2009 ST AP CO Construct Apron construct NW Quad (and associated taxilane)embankment, phase 3 8/24/2009 7/12/2016 $2,100,219
2009 3-02-0133-050-2009 ST AP CO Construct Apron construct NE Quad embankment, phase 3 8/24/2009 7/12/2016 $2,000,000
2009 3-02-0133-050-2009 SA RW SF Construct Runway Safety Area 08/26 construct runway safety area, phase 3 8/24/2009 7/12/2016 $9,611,560
2008 3-02-0133-049-2008 SA RW SF Construct Runway Safety Area 08/26 (Construction Phase 2) 6/23/2008 9/9/2016 $7,506,094
2008 3-02-0133-049-2008 ST AP CO Construct Apron (Construct) 6/23/2008 9/9/2016 $3,000,000
2007 3-02-0133-048-2007 ST AP CO Construct Apron (Mitigation) 8/21/2007 8/11/2015 $1,000,000
2007 3-02-0133-048-2007 ST AP CO Construct Apron (Place Fill) 8/21/2007 8/11/2015 $900,000
2007 3-02-0133-048-2007 ST BD SN Construct Snow Removal Equipment Building (Place Fill) 8/21/2007 8/11/2015 $892,065
2007 3-02-0133-048-2007 ST BD SN Construct Snow Removal Equipment Building (Mitigation) 8/21/2007 8/11/2015 $1,000,000
2007 3-02-0133-048-2007 SA RW SF Construct Runway Safety Area 08/26 (Mitigation) 8/21/2007 8/11/2015 $2,500,000
2007 3-02-0133-048-2007 SA RW SF Construct Runway Safety Area 08/26 (Place Fill) 8/21/2007 8/11/2015 $9,703,834
2007 3-02-0133-048-2007 ST TW CO Construct Taxiway (Mitigation) 8/21/2007 8/11/2015 $100,000
2007 3-02-0133-048-2007 EN OT MT Environmental Mitigation (Mitigation) 8/21/2007 8/11/2015 $700,000
2006 3-02-0133-047-2006 ST TE EX Expand Terminal Building (Planning & Design) 9/1/2006 3/25/2011 $1,000,000
2005 3-02-0133-043-2005 ST AP CO Construct Apron 6/13/2005 8/12/2009 $1,463,162
2005 3-02-0133-046-2005 SA RW SF Construct Runway Safety Area 08/26 (Environmental) 8/11/2005 5/4/2010 $787,135
2005 3-02-0133-045-2005 SA EQ SE Security Enhancements (Security Vehicle) 3/21/2005 11/17/2006 $24,460
2004 3-02-0133-041-2004 ST EQ SR Acquire Friction Measuring Equipment 5/20/2004 3/3/2006 $79,090
2004 3-02-0133-041-2004 ST EQ SN Acquire Snow Removal Equipment 5/20/2004 3/3/2006 $482,480
2004 3-02-0133-044-2004 PL PL MA Conduct Airport Master Plan Study (Terminal Study) 8/20/2004 3/12/2007 $760,000
2004 3-02-0133-042-2004 ST TW IM Extend Taxiway 8/9/2004 4/27/2007 $1,430,793
2004 3-02-0133-040-2004 OT GT AC Rehabilitate Access Road 7/16/2004 11/17/2006 $368,227
2003 3-02-0133-039-2003 SA RW SF Improve Runway Safety Area 08/26 Phase 3 8/26/2003 5/22/2007 $1,303,125
2003 3-02-0133-037-2003 RE TW IM Rehabilitate Taxiway A 8/13/2003 3/3/2006 $3,292,847
2003 3-02-0133-038-2003 SA EQ SE Security Enhancements 8/26/2003 5/20/2005 $372,430
2002 3-02-0133-034-2002 SE SE SE Security Enhancements 4/18/2002 2/14/2005 $89,554
2002 3-02-0133-036-2002 SE SE SE Security Enhancements 8/19/2002 3/6/2006 $116,041
2002 3-02-0133-036-2002 ST TE IM Improve Terminal Building 8/19/2002 3/6/2006 $81,442
2002 3-02-0133-035-2002 ST EQ SN Acquire Snow Removal Equipment 7/22/2002 5/17/2005 $1,097,972
2002 3-02-0133-035-2002 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle 7/22/2002 5/17/2005 $600,555
2001 3-02-0133-033-2001 EN LA 65 Acquire Land for Noise Compatibility within 65 - 69 DNL 7/5/2001 8/26/2004 $328,958
2001 3-02-0133-032-2001 ST TE IM Improve Terminal Building 9/5/2001 5/5/2004 $478,097
2001 3-02-0133-031-2001 SA RW SF Improve Runway Safety Area 9/4/2001 8/26/2004 $1,000,000
2000 3-02-0133-030-2000 SA RW SF Improve Runway Safety Area 9/13/2000 8/26/2004 $700,000
2000 3-02-0133-029-2000 SA RW SF Improve Runway Safety Area 08-26 6/23/2000 6/8/2004 $3,796,728
1999 3-02-0133-027-1999 ST EQ SN Acquire Snow Removal Equipment 7/19/1999 9/6/2001 $164,013
1999 3-02-0133-028-1999 ST TE IM Improve Terminal Building 7/19/1999 9/6/2001 $242,725
1999 3-02-0133-026-1999 RE AP IM Rehabilitate Apron 3/31/1999 9/10/2001 $954,491
1998 3-02-0133-025-1998 ST BD SN Improve Snow Removal Equipment Building 6/22/1998 9/19/2008 $656,196
1998 3-02-0133-024-1998 SA EQ SE Acquire Security Equipment 5/1/1998 9/25/2002 $81,075
1998 3-02-0133-023-1998 ST EQ SN Acquire Snow Removal Equipment 12/10/1997 7/11/2000 $280,626
1997 3-02-0133-022-1997 ST EQ SN Acquire Snow Removal Equipment 5/12/1997 7/11/2000 $500,664
1997 3-02-0133-021-1997 SP RW LI Install Runway Lighting 6/3/1997 9/5/2001 $0
1997 3-02-0133-021-1997 SP RW LI Install Runway Lighting 8/26 6/3/1997 9/5/2001 $795,207
1997 3-02-0133-021-1997 RE TW LI Rehabilitate Taxiway Lighting 6/3/1997 9/5/2001 $332,735
1997 3-02-0133-021-1997 RE RW IM Rehabilitate Runway 8/26 6/3/1997 9/5/2001 $4,213,475
1996 3-02-0133-020-1996 RE RW IM Rehabilitate Runway 8/26 8/12/1996 3/9/1999 $241,650
1996 3-02-0133-020-1996 ST TE IM Improve Terminal Building 8/12/1996 3/9/1999 $130,964
1996 3-02-0133-019-1996 ST EQ SN Acquire Snow Removal Equipment 7/17/1996 7/14/2000 $354,892
1996 3-02-0133-019-1996 SA EQ SE Acquire Security Equipment 7/17/1996 7/14/2000 $147,500
1996 3-02-0133-018-1996 EN OT DI Construct Deicing Containment Facility 4/23/1996 1/28/2000 $301,480
1995 3-02-0133-016-1995 PL PL MA Conduct Airport Master Plan Study 9/20/1995 9/6/2000 $328,125
1995 3-02-0133-017-1995 ST AP IM Expand Apron 9/20/1995 9/25/2000 $292,950
1995 3-02-0133-017-1995 ST RW IM Extend Runway 08/26 9/20/1995 9/25/2000 $240,800
1995 3-02-0133-015-1995 SA RW LI Install Runway Lighting 5/16/1995 1/14/1999 $924,090
1995 3-02-0133-017-1995 RE TW IM Rehabilitate Taxiway 9/20/1995 9/25/2000 $738,734
1994 3-02-0133-014-1994 CA TE IM Improve Terminal Building 9/28/1994 3/30/1999 $167,023
1994 3-02-0133-012-1994 SA OT SG Install Airfield Guidance Signs 6/22/1994 1/14/1999 $741,858
1994 3-02-0133-013-1994 ST EQ SN Acquire Snow Removal Equipment 6/29/1994 7/11/2000 $121,484
1994 3-02-0133-013-1994 SA EQ SE Acquire Security Equipment 6/29/1994 7/11/2000 $23,438
1994 3-02-0133-013-1994 PL PL MS Conduct Miscellaneous Study 6/29/1994 7/11/2000 $150,000
1993 3-02-0133-011-1993 OT GT AC Improve Access Road 4/16/1993 9/25/1997 $143,108
1993 3-02-0133-011-1993 RE TW IM Rehabilitate Taxiway 4/16/1993 9/25/1997 $744,929
1993 3-02-0133-011-1993 RE AP IM Rehabilitate Apron 4/16/1993 9/25/1997 $60,028
1992 3-02-0133-010-1992 RE TW IM Rehabilitate Taxiway 9/24/1992 9/25/1997 $111,398
1992 3-02-0133-010-1992 OT GT AC Improve Access Road 9/24/1992 9/25/1997 $70,747
1992 3-02-0133-010-1992 OT GT AC Improve Access Road 9/24/1992 9/25/1997 $146,940
1992 3-02-0133-009-1992 ST AP LI Install Apron Lighting 7/28/1992 1/3/1995 $11,381
1992 3-02-0133-010-1992 CA TE IM Improve Terminal Building 9/24/1992 9/25/1997 $99,938
1992 3-02-0133-010-1992 SA EQ SE Acquire Security Equipment 9/24/1992 9/25/1997 $52,476
1992 3-02-0133-009-1992 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle 7/28/1992 1/3/1995 $314,948
1992 3-02-0133-009-1992 ST EQ SN Acquire Snow Removal Equipment 7/28/1992 1/3/1995 $468,117
1991 3-02-0133-008-1991 ST EQ SN Acquire Snow Removal Equipment 9/27/1991 2/6/1995 $706,553
1991 3-02-0133-008-1991 SA EQ SE Acquire Security Equipment 9/27/1991 2/6/1995 $95,019
1989 3-02-0133-007-1989 CA AP CO Construct Apron 6/28/1989 1/6/1993 $1,174,583
1989 3-02-0133-007-1989 CA TW CO Construct Taxiway 6/28/1989 1/6/1993 $268,560
1989 3-02-0133-007-1989 CA TW CO Construct Taxiway 6/28/1989 1/6/1993 $4,443,509
1989 3-02-0133-007-1989 ST RW LI Install Runway Lighting 6/28/1989 1/6/1993 $68,054
1989 3-02-0133-007-1989 CA GT AC Improve Access Road 6/28/1989 1/6/1993 $202,719
1988 3-02-0133-005-1988 SA EQ SE Acquire Security Equipment 1/13/1988 2/6/1991 $336,233
1988 3-02-0133-006-1988 ST EQ MS Acquire Aircraft Rescue & Fire Fighting Safety Equipment 6/8/1988 9/9/1992 $47,452
1988 3-02-0133-005-1988 ST EQ SN Acquire Snow Removal Equipment 1/13/1988 2/6/1991 $218,645
1987 3-02-0133-004-1987 ST EQ MS Acquire Aircraft Rescue & Fire Fighting Safety Equipment 7/28/1987 2/6/1991 $604,539
1986 3-02-0133-002-1986 PL PL MA Conduct Airport Master Plan Study 5/22/1986 4/22/1993 $147,652
1986 3-02-0133-002-1986 EN PL NO Conduct Noise Compatibility Plan Study 5/22/1986 4/22/1993 $108,137
1985 3-02-0133-003-1985 ST LA DV Acquire Land for Development 9/18/1985 11/13/1986 $781,310
1983 3-02-0133-001-1983 ST AP CO Construct Apron 9/20/1983 8/12/1987 $226,218
1983 3-02-0133-001-1983 ST AP CO Construct Apron 9/20/1983 8/12/1987 $1,025,649
1983 3-02-0133-001-1983 ST AP IM Expand Apron 9/20/1983 8/12/1987 $192,094
1983 3-02-0133-001-1983 RE AP IM Rehabilitate Apron 9/20/1983 8/12/1987 $621,827