Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

NOME: AIP Grants

Base Information
Owner: ALASKA DOT&PF NORTHERN REGION
NPIAS: 02-0199
Airport Use: Public
Type: Airport
FAA Associated City: NOME
DOT&PF Region: Northern
DOT Owned: True
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 47
Total Number of Grant Work Codes: 86 Total Grants: $167,664,790.00
Total Number of Open Grant Work Codes: 16 Total Open Grants: $47,057,806.00
Total Number of Closed Grant Work Codes: 70 Total Closed Grants: $120,606,984.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2022 3-02-0199-032-2022 CV RG GN General ARPA 12/14/2021 $1,320,792
2021 3-02-0199-031-2021 CV CR GN CRRSA Act Funds 4/26/2021 $1,022,205
2020 3-02-0199-030-2020 RE RW LI Rehabilitate Runway Lighting 9/24/2020 $950,000
2020 3-02-0199-030-2020 OT SV IM Improve/Modify/Rehabilitate Service Road 9/24/2020 $845,449
2020 3-02-0199-029-2020 RE RW IM Rehabilitate Runway 9/18/2020 $12,656,250
2020 3-02-0199-030-2020 RE RW IM Rehabilitate Runway 9/24/2020 $18,447,443
2019 3-02-0199-028-2019 RC RW IM Reconstruct Runway 10/28 Reconstruct 370' of RW 10/28 that has settled unevenly 7/23/2019 $1,406,250
2019 3-02-0200-125-2019 RE RW IM [Various Grant] Rehabilitate Runway 03/21 Various SPM (Nome): Rehabilitate Marking on Runways 10/28 and 3/21, and, incidentally, Taxiways D, E, F, G, H, and J, and Aprons. 9/27/2019 $31,732
2019 3-02-0200-125-2019 RE RW IM [Various Grant] Rehabilitate Runway 10/28 Various SPM (Nome): Rehabilitate Marking on Runways 10/28 and 3/21, and, incidentally, Taxiways D, E, F, G, H, & J, and Aprons. 9/27/2019 $38,784
2018 3-02-0200-122-2018 RE RW IM [Various Grant] Rehabilitate Runway 03/21 Various SPM - Nome (Marking RWY 3/21, and, incidentally TWY's and Aprons) 9/18/2018 $33,443
2018 3-02-0200-122-2018 RE RW IM [Various Grant] Rehabilitate Runway 10/28 Various SPM - Nome (Marking RWY 10/28, and, incidentally, TWY's and Aprons) 9/18/2018 $33,442
2018 3-02-0199-026-2018 RE AP IM Rehabilitate Apron Rehabilitate North Apron 9/10/2018 $800,000
2018 3-02-0199-026-2018 RE RW IM Rehabilitate Runway 03/21 selective full-depth repair 9/10/2018 $3,500,000
2018 3-02-0199-026-2018 ST OT MS Install Perimeter Fencing not Required by 49 CFR 1542 9/10/2018 $4,162,500
2018 3-02-0199-026-2018 RE RW IM Rehabilitate Runway 10/28 selective full-depth repair 9/10/2018 $1,780,854
2017 3-02-0200-118-2017 RE RW IM [Various Grant] Rehabilitate Runway 03/21 Various Surface Preservation Maintenance (Nome) - Crack Seal and Re-Marking Runways 3/21 and 12/28 (and incidental Taxiways D, E, H, J, F North, F South, G North, and North and South Aprons) 9/21/2017 2/11/2022 2/25/2022 $32,461
2017 3-02-0200-110-2017 SA EQ SE [Various Grant] Install Perimeter Fencing required by 49 CFR 1542 Install card reader access control system at 2 existing security gates 9/21/2017 2/14/2022 8/1/2022 $622,831
2017 3-02-0200-113-2017 OT EQ MS [Various Grant] Acquire Interactive Training System Various 139 Airports - Acquire Interactive Training System 9/21/2017 7/15/2021 11/30/2021 $11,443
2017 3-02-0200-118-2017 RE RW IM [Various Grant] Rehabilitate Runway 10/28 Various Surface Preservation Maintenance (Nome) - Crack Seal and Re-Marking Runways 3/21 and 12/28 (and incidental Taxiways D, E, H, J, F North, F South, G North, and North and South Aprons) 9/21/2017 2/11/2022 2/25/2022 $35,167
2016 3-02-0200-109-2016 RE RW IM [Various Grant] Rehabilitate Runway 10/28 Various Surface Preservation Maintenance (Nome) [This grant will fund Remarking on Runway 10/28 (     linear feet), Runway 3/21 (     linear feet), Taxiways (     linear feet), and Apron (     square yards) at the Nome Airport.] 9/19/2016 12/1/2020 11/22/2021 $68,668
2016 3-02-0199-025-2016 SA EQ RF Acquire Safety and/or Security Equipment Replace Security Gates 8/29/2016 4/15/2020 $416,827
2016 3-02-0200-106-2016 ST EQ SN [Various Grant] Acquire Snow Removal Equipment Acquire Various SRE (Nome, Deicer Truck)[This grant will fund the acquisition of a Deicer Truck at the Nome Airport for the purpose of Snow Removal.] 9/19/2016 10/16/2020 11/18/2021 $294,946
2015 3-02-0200-104-2015 RE RW IM [Various Grant] Rehabilitate Runway 03/21 Accomplish Various Airport Surface Preservation Maintenance (Nome RWYs and TWYs Marking) 9/21/2015 7/18/2022 7/18/2022 $68,248
2015 3-02-0200-101-2015 ST EQ SN [Various Grant] Acquire Snow Removal Equipment Acquire Various SRE (Nome Tug with Graveling Broom, and Grader) 9/21/2015 12/7/2020 11/18/2021 $1,061,632
2014 3-02-0199-024-2014 RE AP IM Rehabilitate Apron Rehabilitate N and S apron 6/23/2014 3/13/2020 $2,000,000
2014 3-02-0199-024-2014 RE TW IM Rehabilitate Taxiway Taxiway E&F 6/23/2014 3/13/2020 $2,795,636
2013 3-02-0199-023-2013 RE AP IM Rehabilitate Apron 9/24/2013 3/13/2020 $3,237,337
2013 3-02-0200-094-2013 ST EQ SN [Various Grant] Acquire Snow Removal Equipment Acquire SRE (Blower) 9/19/2013 3/12/2018 $178,236
2013 3-02-0200-089-2013 SA OT OB [Various Grant] Remove Obstructions Various Obstruction Removal (Nome) 9/18/2013 7/7/2020 $28,662
2013 3-02-0200-092-2013 PL PL WH [Various Grant] Wildlife Hazard Assessments 9/19/2013 11/2/2018 $65,823
2013 3-02-0199-022-2013 SA RW SF Construct Runway Safety Area 03/21 Construct Runway Safety Area (EMAS SRE and grip tester equip.) 9/19/2013 3/5/2020 $25,000,000
2013 3-02-0199-022-2013 SA RW SF Construct Runway Safety Area 10/28 Construct Runway Safety Area (includes ROW) 9/19/2013 3/5/2020 $15,781,395
2012 3-02-0199-021-2012 RE RW IM Rehabilitate Runway 10/28 6/15/2012 12/7/2016 $1,955,088
2010 3-02-0199-020-2010 PL PL GI Collect airport data for Airports Geographic Information System 7/19/2010 5/14/2015 $334,927
2010 3-02-0200-074-2010 ST EQ SN [Various Grant] Acquire Snow Removal Equipment Acquire SRE (Northern Region): Nome Blower & Broom 7/7/2010 2/25/2013 $770,415
2010 3-02-0199-019-2010 PL PL MA Update Airport Master Plan Study Update MP-Ph2 8/17/2010 9/2/2014 $85,067
2009 3-02-0200-072-2009 SA EQ RF [Various Grant] Acquire Safety and/or Security Equipment Acquire Water Rescue Plan Equipment 9/24/2009 11/12/2014 $103,425
2007 3-02-0200-060-2007 RE RW IM [Various Grant] Rehabilitate Runway (Maintenance) 5/31/2007 8/6/2013 $120,240
2007 3-02-0199-017-2007 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire 3000-Gallon ARFF Vehicle 8/22/2007 5/4/2010 $927,524
2007 3-02-0199-016-2007 RE RW IM Rehabilitate Runway 10/28 (Phase 2) 8/23/2007 6/3/2011 $1,289,097
2007 3-02-0199-016-2007 RE RW IM Rehabilitate Runway 03/21 (Phase 2) 8/23/2007 6/3/2011 $6,364,064
2007 3-02-0199-018-2007 PL PL MA Update Airport Master Plan Study 8/28/2007 4/11/2012 $491,889
2006 3-02-0199-015-2006 SA OT OB Remove Obstructions (Utility Pole Removal) 9/1/2006 2/27/2012 $1,000,000
2006 3-02-0199-015-2006 RE RW IM Rehabilitate Runway 10/28 9/1/2006 2/27/2012 $4,586,613
2006 3-02-0199-015-2006 RE RW IM Rehabilitate Runway 03/21 (Phase 1) 9/1/2006 2/27/2012 $499,784
2006 3-02-0199-014-2006 ST BD SN Construct Snow Removal Equipment Building (Phase 2) 7/25/2006 9/15/2011 $740,594
2006 3-02-0199-014-2006 SA BD EX Construct Aircraft Rescue & Fire Fighting Building (Phase 2) 7/25/2006 9/15/2011 $829,246
2006 3-02-0200-054-2006 ST EQ SN [Various Grant] Acquire Snow Removal Equipment (Acquire Sander Attachment) 8/21/2006 7/20/2010 $32,064
2005 3-02-0199-013-2005 SA BD EX Construct Aircraft Rescue & Fire Fighting Building (Phase 1) 8/29/2005 3/23/2010 $4,571,409
2005 3-02-0199-013-2005 ST BD SN Construct Snow Removal Equipment Building (Phase 1) 8/29/2005 3/23/2010 $5,350,000
2001 3-02-0199-012-2001 RE RW IM Rehabilitate Runway 9/24/2001 3/9/2007 $6,138,502
2001 3-02-0199-012-2001 SA RW SF Improve Runway Safety Area 9/24/2001 3/9/2007 $2,685,269
2001 3-02-0199-012-2001 PL PL MS Update Miscellaneous Study 9/24/2001 3/9/2007 $829,478
1999 3-02-0199-011-1999 RE RW IM Rehabilitate Runway 09-27 9/29/1999 9/12/2002 $1,150,164
1999 3-02-0199-010-1999 SA RW SF Improve Runway Safety Area 9/27 8/4/1999 9/12/2002 $712,960
1999 3-02-0199-010-1999 RE RW IM Rehabilitate Runway 9/27 8/4/1999 9/12/2002 $1,243,251
1999 3-02-0199-010-1999 SA OT OB Remove Obstructions 9/27 8/4/1999 9/12/2002 $50,000
1997 3-02-0199-009-1997 RE AP IM Rehabilitate Apron 12/17/1997 9/17/2001 $1,392,968
1997 3-02-0199-009-1997 RE TW IM Rehabilitate Taxiway 12/17/1997 9/17/2001 $353,768
1994 3-02-0199-008-1994 SA RW LI Install Runway Lighting 6/21/1994 9/27/1999 $89,580
1994 3-02-0199-008-1994 ST RW IM Extend Runway 09/27 6/21/1994 9/27/1999 $2,880,101
1993 3-02-0199-007-1993 ST RW IM Extend Runway RW 9/27 9/9/1993 8/22/2000 $1,697,265
1993 3-02-0199-007-1993 ST RW IM Extend Runway RW 9/27 9/9/1993 8/22/2000 $526,996
1993 3-02-0199-007-1993 SA RW LI Install Runway Lighting 9/9/1993 8/22/2000 $63,558
1993 3-02-0199-007-1993 ST LA DV Acquire Land for Development 9/9/1993 8/22/2000 $337,500
1992 3-02-0199-006-1992 PL PL MA Conduct Airport Master Plan Study 9/10/1992 9/9/1997 $279,968
1991 3-02-0199-005-1991 ST TW CO Construct Taxiway 8/23/1991 9/30/2002 $24,908
1991 3-02-0199-005-1991 SA RW LI Install Runway Lighting 8/23/1991 9/30/2002 $240,772
1991 3-02-0199-005-1991 ST AP LI Install Apron Lighting 8/23/1991 9/30/2002 $29,970
1991 3-02-0199-005-1991 SP OT IN Install Miscellaneous NAVAIDS 8/23/1991 9/30/2002 $202,500
1991 3-02-0199-005-1991 RE RW IM Rehabilitate Runway 9/27 8/23/1991 9/30/2002 $8,109,185
1988 3-02-0199-004-1988 RE RW IM Rehabilitate Runway 2/20 9/26/1988 9/29/1994 $4,068,829
1988 3-02-0199-004-1988 RE TW IM Rehabilitate Taxiway 9/26/1988 9/29/1994 $290,000
1988 3-02-0199-004-1988 RE TW LI Rehabilitate Taxiway Lighting 9/26/1988 9/29/1994 $53,000
1988 3-02-0199-004-1988 ST RW LI Install Runway Lighting 9/26/1988 9/29/1994 $109,000
1988 3-02-0199-004-1988 ST RW SF Improve Runway Safety Area 2/20 9/26/1988 9/29/1994 $17,000
1988 3-02-0199-004-1988 ST AP LI Install Apron Lighting 9/26/1988 9/29/1994 $28,000
1988 3-02-0199-004-1988 SP RW FR Groove Runway 2/20 9/26/1988 9/29/1994 $137,000
1988 3-02-0199-004-1988 CA GT AC Improve Access Road 9/26/1988 9/29/1994 $139,000
1988 3-02-0199-004-1988 ST OT IM Improve Airport Drainage 9/26/1988 9/29/1994 $2,287,196
1988 3-02-0199-004-1988 CA AP CO Construct Apron 9/26/1988 9/29/1994 $153,000
1986 3-02-0199-003-1986 ST LA DV Acquire Land for Development 9/9/1986 4/23/1991 $290,461
1986 3-02-0199-002-1986 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle 7/17/1986 11/20/1991 $240,208
1984 3-02-0199-001-1984 ST RW IM Extend Runway 927-220 8/13/1984 4/19/1991 $335,135
1984 3-02-0199-001-1984 SP RW FR Groove Runway 927-220 8/13/1984 4/19/1991 $350,102
1984 3-02-0199-001-1984 RE RW IM Rehabilitate Runway 927-220 8/13/1984 4/19/1991 $1,348,294