Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Communities
Contacts
ROBE LAKE
:
AIP Grants
Base Information
Owner:
ALASKA DEPT OF NATURAL RESOURCES
NPIAS:
---
Airport Use:
Public
Type:
SEAPLANE BASE
FAA Associated City:
VALDEZ
DOT&PF Region:
---
DOT Owned:
False
Facility Status:
Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:
Purpose
Definition
CA
Capacity
EN
Environment
OT
Other
PL
Planning
RC
Reconstruction
RE
Rehabilitate
SA
Safety/Security
SB
State Block Grant Program
SE
Security Enhancements
SP
Statutory Emphasis Programs
ST
Standards
Select All
CA-Capacity
EN-Environment
OT-Other
PL-Planning
RC-Reconstruction
RE-Rehabilitate
SA-Safety/Security
SB-State Block Grant Program
SE-Security Enhancements
SP-Statutory Emphasis Programs
ST-Standards
Component:
Component
Definition
RW
Runway Projects
TW
Taxiway Projects
AP
Apron Projects
TE
Terminal Projects
BD
Building Projects (other than terminals)
GT
Ground Transportation Projects
EQ
Equipment, Security, and Fencing
OT
Other Projects
LA
Land Acquisition (other than noise land)
NA
New Airport Projects
PL
Planning Projects
SB
Seaplane Base Projects
HE
Heliport/Helipad Projects
VT
Vertiport Projects
HO
Noise Projects (other than planning)
PB
Noise Mitigation Measures for Public Buildings
Select All
RW-Runway Projects
TW-Taxiway Projects
AP-Apron Projects
TE-Terminal Projects
BD-Building Projects (other than terminals)
GT-Ground Transportation Projects
EQ-Equipment, Security, and Fencing
OT-Other Projects
LA-Land Acquisition (other than noise land)
NA-New Airport Projects
PL-Planning Projects
SB-Seaplane Base Projects
HE-Heliport/Helipad Projects
VT-Vertiport Projects
HO-Noise Projects (other than planning)
PB-Noise Mitigation Measures for Public Buildings
Type:
Type
Definition
60
Noise Mitigation Measures for Residences outside 65 DNL
65
Noise Mitigation Measures for Residences within 65 - 69 DNL
70
Noise Mitigation Measures for Residences within 70 - 74 DNL
75
Noise Mitigation Measures for Residences within 75 DNL
AC
Access
AQ
Acquire Existing Airport
CO
Construct
DI
Deicing
DV
Development
ES
Environment Sustainable
EX
Extend
FF
Fuel Farm
FR
Groove Runway
IM
Improve
Type
Definition
IN
Install Instruments
LI
Lighting
MA
Master Planning
ME
Metropolitan System Plan
MS
Miscellaneous
MT
Environmental Mitigation
NO
Noise
OB
Obstructions
PA
Parking
PM
People Mover
PR
On-Airport Energy Production
RF
Rescue & Fire Fighting
RL
Rail
SE
Security Enhancements
Type
Definition
SF
Safety Area
SG
Guidance Signs
SN
Snow Removal
SR
Sensors
ST
State System Plan
SV
Service Road
SZ
Acquire land/easement for approaches
VI
Vertical/Visual Guidance System
VT
Conduct Vertiport Plan
WH
Wildlife Hazard Assessments
WR
Construct Wash Rack
WX
Install Weather Reporting Equipment
ZE
Zero Emissions Vehicle/Infrastructure
Select All
60-Noise Mitigation Measures for Residences outside 65 DNL
65-Noise Mitigation Measures for Residences within 65 - 69 DNL
70-Noise Mitigation Measures for Residences within 70 - 74 DNL
75-Noise Mitigation Measures for Residences within 75 DNL
AC-Access
AQ-Acquire Existing Airport
CO-Construct
DI-Deicing
DV-Development
ES-Environment Sustainable
EX-Extend
FF-Fuel Farm
FR-Groove Runway
IM-Improve
IN-Install Instruments
LI-Lighting
MA-Master Planning
ME-Metropolitan System Plan
MS-Miscellaneous
MT-Environmental Mitigation
NO-Noise
OB-Obstructions
PA-Parking
PM-People Mover
PR-On-Airport Energy Production
RF-Rescue & Fire Fighting
RL-Rail
SE-Security Enhancements
SF-Safety Area
SG-Guidance Signs
SN-Snow Removal
SR-Sensors
ST-State System Plan
SV-Service Road
SZ-Acquire land/easement for approaches
VI-Vertical/Visual Guidance System
VT-Conduct Vertiport Plan
WH-Wildlife Hazard Assessments
WR-Construct Wash Rack
WX-Install Weather Reporting Equipment
ZE-Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
Select All
Open
Closed
Grant Summary Statistics
Total Grants:
0
Total Number of Grant Work Codes:
0
Total Grants:
$0.00
Total Number of Open Grant Work Codes:
0
Total Open Grants:
$0.00
Total Number of Closed Grant Work Codes:
0
Total Closed Grants:
$0.00
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to
Reports >> AIP Grants
.