Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Links
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Communities
Contacts
KARLUK
:
Airport Needs List
Base Information
Owner:
ALASKA DOT&PF SOUTHCOAST REGION
NPIAS:
02-0138
Airport Use:
Public
Type:
Airport
FAA Associated City:
KARLUK
DOT&PF Region:
Southcoast
DOT Owned:
True
Facility Status:
Active
Filter +/-
Needs Funding Source:
Select All
AIP
IARF
M&O Operating
Stimulus
N/A
Status:
All (Excludes Closed)
Need Created
In Project
Closed
Need Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
M&O Activity:
Select All
Aircraft Rescue & Firefighting Equipment
Buildings
Crack Sealing
Drainage Maintenance & Repair
Dust Control
Embankment Stabilization
Erosion Control
Fence and Gate Repair/Replacement/Installation
Flexible Threshold Markers
Lighting Repair/Replacement
Minor Gravel Resurfacing
Minor Pavement Repair
Obstruction Removal
Pavement Markings
Runway Grading
Safety Areas
Snow Removal Equipment
Stability Control
Vegetation Control
Replacement of Visual Aids
ASAP Needs Total:
$0
Short Term Needs Total:
$1,339,000
Mid Term Needs Total:
$2,900,070
Long Term Needs Total:
All Needs Total:
$4,239,070
Needs in Project Total:
$1,799,000
Number of Needs:
5
Number of Needs in Project:
2
Needs List
Needs
Priority
Need Origination
Funding Source
Status
Estimated Cost
Last Edit Date
Last Verified Date
Karluk SREB
Karluk SREB
Mid
Sponsor
AIP
Need Created
$2,440,070
7/16/2019
Construct Passenger Shelter
Construct Passenger Shelter
Long
Community
N/A
Need Created
2/27/2023
Construct Toilet Facilities
Construct Toilet Facilities
Long
Community
N/A
Need Created
2/27/2023
Equipment: ST EQ SN: Acquire Snow Removal Equipment
Replace Grader
Mid
M&O
AIP
Programmed Need
$460,000
8/20/2024
Runway: RE RW IM: Rehabilitate Runway
Airport surface rehabilitation
Short
M&O
AIP
Programmed Need
$1,339,000
8/20/2024
Total
$4,239,070