HOMER
:
Airport Needs List
Base Information
Owner:
ALASKA DOT&PF CENTRAL REGION
NPIAS:
02-0122
Airport Use:
Public
Type:
Airport
FAA Associated City:
HOMER
DOT&PF Region:
Central
DOT Owned:
True
Facility Status:
Active
Filter +/-
Needs Funding Source:
Select All
AIP
IARF
M&O Operating
Stimulus
N/A
Status:
All (Excludes Closed)
Need Created
In Project
Closed
Need Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
M&O Activity:
Select All
Aircraft Rescue & Firefighting Equipment
Buildings
Crack Sealing
Drainage Maintenance & Repair
Dust Control
Embankment Stabilization
Erosion Control
Fence and Gate Repair/Replacement/Installation
Flexible Threshold Markers
Lighting Repair/Replacement
Minor Gravel Resurfacing
Minor Pavement Repair
Obstruction Removal
Pavement Markings
Runway Grading
Safety Areas
Snow Removal Equipment
Stability Control
Vegetation Control
Replacement of Visual Aids
ASAP Needs Total:
$56,836
Short Term Needs Total:
$2,120,227
Mid Term Needs Total:
$48,916,698
Long Term Needs Total:
$0
All Needs Total:
$51,093,761
Needs in Project Total:
$41,018,761
Number of Needs:
15
Number of Needs in Project:
13
Needs List
Needs
Priority
Need Origination
Funding Source
Status
Estimated Cost
Last Edit Date
Last Verified Date
Acquire replacement water rescue rafts
Acquire replacement water rescue rafts
Short
Letter of Compliance
AIP
In Project
$36,392
3/17/2021
Crack Seal & Pavement Markings (2026)
Crack Seal & Pavement Markings (2026)
Mid
M&O
AIP
In Project
$213,800
3/3/2023
Homer Chemical Storage Building
Homer Chemical Storage Building
Mid
Other
AIP
In Project
$4,053,698
3/15/2019
Pavement Rehab and Resurface - Stage 1
Pavement Rehab and Resurface - Stage 1
Mid
Inspection
AIP
In Project
$22,866,000
2/23/2021
Purchase AFFF Testing Equipment
Purchase AFFF Testing Equipment
ASAP
Other
AIP
In Project
$56,836
3/22/2021
Purchase Plow Truck/Sander 8 Yard
Purchase Plow Truck/Sander 8 Yard
Short
Other
AIP
In Project
$475,335
1/26/2022
Purchase Single Engine Sweeper/Snow Blower
Purchase Single Engine Sweeper/Snow Blower
Short
State Equipment Fleet (SEF)
AIP
In Project
$761,000
1/26/2022
Rehabilitate Pavement on GA Apron & TW A & B
Rehabilitate Pavement on GA Apron & TW A & B
Long
ALP/Master Plan
AIP
In Project
$0
6/12/2015
Rehabilitate Runway, Taxiways, and Aprons
Rehabilitate Runway, Taxiways, and Aprons
Short
Inspection
AIP
In Project
$0
1/28/2022
Tree removals east of runway
Tree removals east of runway
Mid
ALP/Master Plan
AIP
In Project
$0
6/12/2015
Update master plan
Update master plan
Short
Sponsor
AIP
In Project
$772,500
5/5/2021
Vehicle gates with electronic swipe capability
Vehicle gates with electronic swipe capability
N/A
Other
N/A
In Project
$0
6/3/2015
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
Short
Sponsor
Stimulus
Need Created
$75,000
3/24/2022
Taxiway: EN TW CO: Construct Taxiway
Parallel Taxiway
Mid
ALP/Master Plan
AIP
Need Created
$10,000,000
10/31/2024
Pavement Rehab and Resurface - Stage 2
Pavement Rehab and Resurface - Stage 2
Mid
Inspection
AIP
Obligated Need
$11,783,200
2/23/2021
Total
$51,093,761