Needs | Priority | Need Origination | Funding Source | Status | Estimated Cost | Last Edit Date | Last Verified Date |
Pavement Marking & Crack Seal
Pavement Marking & Crack Seal
|
Short
|
M&O
|
AIP
|
In Project
|
$200,438
| 1/20/2023 | |
Construct Floatplane Ramp and Access Road
Construct Floatplane Ramp and Access Road
|
Mid
|
ALP/Master Plan
|
AIP
|
Need Created
|
$257,500
| 9/7/2021 | |
Equipment: ST EQ SN: Acquire Snow Removal Equipment
Purchase New Snow-Blower
|
Mid
|
M&O
|
AIP
|
Need Created
|
$403,750
| 10/8/2024 | |
Erosion and Drainage Study
Erosion and Drainage Study
|
Mid
|
ALP/Master Plan
|
AIP
|
Need Created
|
$442,900
| 9/7/2021 | |
Erosion Protection and Levee Rehabilitation
Erosion Protection and Levee Rehabilitation
|
N/A
|
ALP/Master Plan
|
AIP
|
Need Created
|
$20,291,000
| 9/7/2021 | |
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
|
Short
|
Sponsor
|
Stimulus
|
Need Created
|
$75,000
| 3/24/2022 | |
Equipment: ST EQ SN: Acquire Snow Removal Equipment
Replace Loader
|
Mid
|
M&O
|
AIP
|
Programmed Need
|
$400,000
| 10/8/2024 | |
Equipment: ST EQ SN: Acquire Snow Removal Equipment
Replace Plow/Sand Truck
|
Mid
|
M&O
|
AIP
|
Programmed Need
|
$400,000
| 10/8/2024 | |
| | | | |
Total
| | |