| Needs | Priority | Need Origination | Funding Source | Status | Estimated Cost | Last Edit Date | Last Verified Date | 
					| Pavement Marking & Crack Seal
                        
                            Pavement Marking & Crack Seal | Short | M&O | AIP | In Project | $200,438 | 1/20/2023 |  | 
					| Construct Floatplane Ramp and Access Road
                        
                            Construct Floatplane Ramp and Access Road | Mid | ALP/Master Plan | AIP | Need Created | $257,500 | 9/7/2021 |  | 
					| Equipment: ST EQ SN: Acquire Snow Removal Equipment
                        
                            Purchase New Snow-Blower | Mid | M&O | AIP | Need Created | $415,862 | 10/8/2024 |  | 
					| Erosion and Drainage Study
                        
                            Erosion and Drainage Study | Mid | ALP/Master Plan | AIP | Need Created | $442,900 | 9/7/2021 |  | 
					| Erosion Protection and Levee Rehabilitation
                        
                            Erosion Protection and Levee Rehabilitation | N/A | ALP/Master Plan | AIP | Need Created | $20,291,000 | 9/7/2021 |  | 
					| Install Continuously Operating Reference Stations (CORS)
                        
                            Install Continuously Operating Reference Stations (CORS) | Short | Sponsor | Stimulus | Need Created | $75,000 | 3/24/2022 |  | 
					| Runway Projects: ST RW CO : Construct Runway
                        
                            Section 106 Support Post RW Shift | Short | Other | AIP | Obligated Need | $500,000 | 1/31/2025 |  | 
					| Equipment: ST EQ SN: Acquire Snow Removal Equipment
                        
                            Replace Loader | Mid | M&O | AIP | Programmed Need | $400,000 | 10/8/2024 |  | 
					| Equipment: ST EQ SN: Acquire Snow Removal Equipment
                        
                            Replace Plow/Sand Truck | Mid | M&O | AIP | Programmed Need | $400,000 | 10/8/2024 |  | 
					|  |  |  |  |  | Total |  |  |