Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

VALDEZ PIONEER FLD: AIP Grants

Base Information
Owner: ALASKA DOT&PF NORTHERN REGION
NPIAS: 02-0311
Airport Use: Public
Type: Airport
FAA Associated City: VALDEZ
DOT&PF Region: Northern
DOT Owned: True
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 28
Total Number of Grant Work Codes: 32 Total Grants: $42,907,161.00
Total Number of Open Grant Work Codes: 7 Total Open Grants: $16,394,805.00
Total Number of Closed Grant Work Codes: 25 Total Closed Grants: $26,512,356.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2024 3-02-0311-013-2024 ST BD SN Construct/Expand Snow Removal Equipment Building 9/10/2024 $14,721,191
2021 3-02-0311-012-2021 ST EQ SN Acquire Snow Removal Equipment 9/8/2021 $848,991
2019 3-02-0200-125-2019 RE RW IM [Various Grant] Rehabilitate Runway 06/24 Various SPM (Valdez): Rehabilitate Marking on Runway 6/24, and incidentally, Taxiways A, B, and C, and Apron. 9/27/2019 $70,516
2018 3-02-0200-120-2018 ST OT IN [Various Grant] Install Miscellaneous NAVAIDS Various Visual Aid Replacement (Valdez - Remove and Replace Primary Wind Cone, Secondary Wind Cone, and Segmented Circle) 9/18/2018 $310,334
2018 3-02-0200-119-2018 ST EQ SN [Various Grant] Acquire Snow Removal Equipment Acquire Various SRE - Valdez (Loader) 9/18/2018 $97,177
2018 3-02-0200-122-2018 RE RW IM [Various Grant] Rehabilitate Runway 06/24 Various SPM - Valdez (Marking Runway 6/24, and, incidentally, TWY's and Apron) 9/18/2018 $66,885
2018 3-02-0311-011-2018 PL PL VI Conduct Aeronautical Survey for RNAV Approach Conduct aeronautical survey for Master Plan and RNAV approach 9/6/2018 $279,711
2017 3-02-0311-010-2017 PL PL MA Update Airport Master Plan Study Update Airport Master Plan Study 8/22/2017 2/16/2022 3/8/2022 $609,375
2017 3-02-0200-113-2017 OT EQ MS [Various Grant] Acquire Interactive Training System Various 139 Airports - Acquire Interactive Training System 9/21/2017 7/15/2021 11/30/2021 $5,721
2017 3-02-0200-117-2017 ST EQ SN [Various Grant] Acquire Snow Removal Equipment Various Snow Removal Equipment (Valdez) - Grader 9/21/2017 8/6/2021 12/15/2021 $393,262
2017 3-02-0200-118-2017 RE RW IM [Various Grant] Rehabilitate Runway 06/24 Various Surface Preservation Maintenance (Valdez) - Crack Seal and Re-Marking Runway 06/24 (and incidental Taxiways A, B, and C, and Apron) 9/21/2017 2/11/2022 2/25/2022 $67,628
2016 3-02-0200-109-2016 RE RW IM [Various Grant] Rehabilitate Runway 06/24 Various Surface Preservation Maintenance (Valdez) [This grant will fund Remarking of Runway 6/24 (     linear feet), Taxiways (     linear feet), and Apron (     square yards) at the Valdez Pioneer Field Airport.] 9/19/2016 12/1/2020 11/22/2021 $52,021
2015 3-02-0200-104-2015 RE RW IM [Various Grant] Rehabilitate Runway 06/24 Accomplish Various Airport Surface Preservation Maintenance (Valdez RWY and TWY Marking) 9/21/2015 7/18/2022 7/18/2022 $65,146
2015 3-02-0200-101-2015 ST EQ SN [Various Grant] Acquire Snow Removal Equipment Acquire Various SRE (Valdez Truck with Plow and Sander) 9/21/2015 12/7/2020 11/18/2021 $438,285
2014 3-02-0311-009-2014 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle 9/17/2014 3/12/2018 $736,131
2013 3-02-0200-094-2013 ST EQ SN [Various Grant] Acquire Snow Removal Equipment Acquire SRE (Dump Truck) 9/19/2013 3/12/2018 $311,670
2011 3-02-0200-079-2011 RE RW IM [Various Grant] Rehabilitate Runway 06/24 Various Surface Preservation 9/16/2011 6/6/2017 $104,785
2011 3-02-0200-082-2011 ST OT OB [Various Grant] Remove Obstructions Various Obstruction Removal (Valdez) 9/26/2011 7/19/2017 $46,000
2009 3-02-0200-072-2009 SA EQ RF [Various Grant] Acquire Safety and/or Security Equipment Acquire Water Rescue Plan Equipment 9/24/2009 11/12/2014 $95,306
2008 3-02-0200-063-2008 ST EQ SN [Various Grant] Acquire Snow Removal Equipment Acquire Northern SRE - Valdez Towed Broom 6/16/2008 5/21/2010 $428,595
2007 3-02-0311-008-2007 SA RW SF Extend Runway Safety Area 06/24 (Phase 2) 8/15/2007 3/7/2012 $3,138,106
2007 3-02-0311-008-2007 ST EQ SE Install Perimeter Fencing 8/15/2007 3/7/2012 $33,000
2006 3-02-0200-054-2006 ST EQ SN [Various Grant] Acquire Snow Removal Equipment (Acquire Rotary Snow Blower) 8/21/2006 7/20/2010 $579,425
2004 3-02-0311-006-2004 RE RW IM Rehabilitate Runway 06/24 8/6/2004 6/16/2008 $9,047,303
2004 3-02-0311-007-2004 ST BD SN Construct Sand and Chemical Storage Building 8/26/2004 4/25/2008 $1,172,825
2004 3-02-0311-006-2004 SA RW SF Extend Runway Safety Area 06/24 8/6/2004 6/16/2008 $6,121,492
2000 3-02-0311-005-2000 PL PL MA Conduct Airport Master Plan Study 5/30/2000 8/25/2004 $436,463
1999 3-02-0311-004-1999 SA BD EX Improve Aircraft Rescue & Fire Fighting Building 3/25/1999 9/18/2001 $1,103,459
1994 3-02-0311-003-1994 ST BD SN Improve Snow Removal Equipment Building 9/7/1994 10/24/1998 $675,556
1994 3-02-0311-003-1994 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle 9/7/1994 10/24/1998 $365,625
1984 3-02-0311-001-1984 ST OT IM Improve Airport Drainage 9/13/1984 2/4/1988 $276,197
1984 3-02-0311-001-1984 OT GT AC Improve Access Road 9/13/1984 2/4/1988 $208,980