Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

CRAIG: Airport Needs List

Base Information
Owner: CITY OF CRAIG
NPIAS: 02-0071
Airport Use: Public
Type: Seaplane Base
FAA Associated City: CRAIG
DOT&PF Region: ---
DOT Owned: False
Facility Status: Active
Filter +/-
Needs Funding Source:
Status:
Need Category:
M&O Activity:
 
ASAP Needs Total:   Short Term Needs Total:
Mid Term Needs Total: Long Term Needs Total:
All Needs Total: Needs in Project Total:
Number of Needs: Number of Needs in Project:
 
Needs List
NeedsPriorityNeed OriginationFunding SourceStatusEstimated CostLast Edit DateLast Verified Date
Acquire additional property at Seaplane Base Acquire additional property at Seaplane Base Short Sponsor AIP Need Created $245,973 3/11/2013 
Add four pull-out ramps to SP float for transient aircraft Add four pull-out ramps to SP float for transient aircraft Mid Sponsor AIP Need Created $3,689,619 3/11/2013 
Expand the terminal building Expand the terminal building Short Sponsor AIP Need Created $614,934 3/11/2013 
Improve street access and provide additional parking for SPB Improve street access and provide additional parking for SPB ASAP Sponsor AIP Need Created $1,229,872 3/11/2013 
New roof, gutters, downspouts and soffit screens on the building New roof, gutters, downspouts and soffit screens on the building Mid Sponsor AIP Need Created $98,388 3/11/2013 
Repair erosion damage to the bank and install new armor rock on the N side of the ramp Repair erosion damage to the bank and install new armor rock on the N side of the ramp Short Sponsor AIP Need Created $86,088 3/11/2013 
Repair or replace worn planking Repair or replace worn planking Short Sponsor AIP Need Created $62,719 3/11/2013 
Replace Craig SPB Facilities (building, floats and access) Replace Craig SPB Facilities (building, floats and access) Mid Sponsor AIP Need Created $11,314,837 3/11/2013 
Replace parking lot, ramp and float lighting with LEDs Replace parking lot, ramp and float lighting with LEDs Short Sponsor AIP Need Created $36,893 3/11/2013 
Upgrade/Repair Access Ramp and Abutment Upgrade/Repair Access Ramp and Abutment Mid Sponsor AIP Need Created $860,909 3/11/2013 
      Total