SHAKTOOLIK: Airport Needs List

Filter +/-
Needs Funding Source:
Status:
Need Category:
 
ASAP Needs Total:   Short Term Needs Total:
Mid Term Needs Total: Long Term Needs Total:
All Needs Total: Needs in Project Total:
Number of Needs: Number of Needs in Project:
 
Needs List
NeedsPriorityNeed OriginationFunding SourceStatusEstimated CostLast Edit DateLast Verified Date
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Minor Gravel Resurfacing and Dust Palliative
Short Inspection AIP In Project $380,240 7/21/2026 
Construct Passenger Shelter
Construct Passenger Shelter
Long Community N/A Need Created 7/5/2022 
Construct Tie-Downs
Construct Tie-Downs
Long Community N/A Need Created 7/5/2022 
Construct Toilet Facilities
Construct Toilet Facilities
Long Community N/A Need Created 7/5/2022 
Acquire Loader (Replace #35027)
Acquire Loader (Replace #35027)
Mid M&O AIP Programmed Need $480,000 10/27/2023 
Airfield: RC AF DR : Reconstruct Airport Drainage/Erosion Control
Improve Runway Safety Area (Shore Erosion Protection)
Short Inspection AIP Programmed Need $4,000,000 7/17/2026 
Equipment, Security, and Fencing: ST EQ IN : Install Wind Cone/Segmented Circle
Install NAVAIDS (Segmented Circle, Wind Cones, Beacon)
Short Inspection AIP Programmed Need $100,000 7/15/2026 
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Grader (Replace 33912)
Mid M&O AIP Programmed Need $490,000 2/3/2025 
Reconstruct Runway Lighting
Reconstruct Runway Lighting
Short Inspection AIP Programmed Need $600,000 8/8/2022 
Reconstruct Taxiway Lighting
Reconstruct Taxiway Lighting
Short Inspection AIP Programmed Need $400,000 8/8/2022 
Rehabilitate Access Road
Rehabilitate Access Road
Mid Inspection AIP Programmed Need $1,600,000 8/8/2022 
Rehabilitate Apron
Rehabilitate Apron
Mid Inspection AIP Programmed Need $2,700,000 8/8/2022 
Rehabilitate Taxiway
Rehabilitate Taxiway
Mid Inspection AIP Programmed Need $3,300,000 8/8/2022 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Resurface Runway and Apply Dust Palliative
Short Inspection AIP Programmed Need $6,000,000 7/21/2026 
      Total   
Needs List Process Flow