State of Alaska official logo Skip to main content
dot-seal
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
aasp-logo

RUBY: Airport Needs List

Filter +/-
Needs Funding Source:
Status:
Need Category:
 
ASAP Needs Total:   Short Term Needs Total:
Mid Term Needs Total: Long Term Needs Total:
All Needs Total: Needs in Project Total:
Number of Needs: Number of Needs in Project:
 
Needs List
NeedsPriorityNeed OriginationFunding SourceStatusEstimated CostLast Edit DateLast Verified Date
Construct a SREB
Construct a SREB
Short Inspection AIP In Project $3,182,700 3/15/2019 
Reconstruct Runway
Reconstruct Runway
Short Community AIP In Project $4,243,600 3/15/2019 
Relocate Road, Improve Approach, and Protect Safety Areas
Relocate Road, Improve Approach, and Protect Safety Areas
Short Inspection AIP In Project $3,522,884 1/14/2016 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Re-Surface Runway, Apron and Taxiway, Apply Dust Palliative, and Upgrade Airport Lighting System
Short Other AIP In Project $7,828,636 7/15/2026 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Minor Gravel Resurfacing (RW/TW/Apron/Access Road)
Mid Inspection AIP In Project $461,458 7/21/2026 
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Loader Wheeler (Replace 39933)
Mid M&O AIP Need Created $480,000 1/26/2026 
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
Short Sponsor Stimulus Need Created $75,000 3/24/2022 
Other Projects: OT CC OB : Remove Obstructions
Brush Cutting
Short Other AIP Need Created $0 4/7/2026 
Construct Passenger Shelter
Construct Passenger Shelter
Long Community N/A Need Created 2/27/2023 
Construct Toilet Facilities
Construct Toilet Facilities
Long Community N/A Need Created 2/27/2023 
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Loader (Replace 35038)
Short Other AIP Programmed Need $393,460 7/21/2026 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Resurface & Apply Dust Palliative 2029
Mid M&O AIP Programmed Need $410,000 1/27/2026 
      Total