POINT HOPE: Airport Needs List

Filter +/-
Needs Funding Source:
Status:
Need Category:
 
ASAP Needs Total:   Short Term Needs Total:
Mid Term Needs Total: Long Term Needs Total:
All Needs Total: Needs in Project Total:
Number of Needs: Number of Needs in Project:
 
Needs List
NeedsPriorityNeed OriginationFunding SourceStatusEstimated CostLast Edit DateLast Verified Date
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
Short Sponsor Stimulus Need Created $75,000 3/24/2022 
Construct Passenger Shelter
Construct Passenger Shelter
Long Community N/A Need Created 7/5/2022 
Construct Toilet Facilities
Construct Toilet Facilities
Long Community N/A Need Created 7/5/2022 
Apron Projects: RE AP IM : Rehabilitate Apron
Rehabilitate Apron
Short Sponsor AIP Obligated Need $2,000,000 7/22/2026 
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Loader (Replace 34523)
Mid M&O AIP Obligated Need $431,250 7/20/2026 
Land Acquisition (other than noise land): BL LA AQ : Acquire Easements/Land for Noise Compatibility
Acquire ROW
Short Sponsor AIP Obligated Need $400,000 7/22/2026 
Runway Projects: RC RW IM : Reconstruct Runway
Reconstruct Runway with New Orientation
Short Sponsor AIP Obligated Need $22,000,000 7/22/2026 
Runway Projects: RC RW LI : Reconstruct Runway Lighting
Reconstruct Runway Lighting
Short Sponsor AIP Obligated Need $600,000 7/22/2026 
Taxiway Projects: RC TW IM : Reconstruct Taxiway
Construct New Taxiway with Realignment
Short Sponsor AIP Obligated Need $3,000,000 7/22/2026 
Taxiway Projects: SP TW LI : Install Taxiway Lighting
Install Taxiway Lighting
Short Sponsor AIP Obligated Need $200,000 7/22/2026 
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Grader (Replace 34542)
Mid M&O AIP Programmed Need $490,000 1/27/2025 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Markings & Crack Seal
Mid M&O AIP Programmed Need $206,000 8/29/2025 