| Needs | Priority | Need Origination | Funding Source | Status | Estimated Cost | Last Edit Date | Last Verified Date |
|
Airport Master Planning: PL MA NP : Develop Sustainable Master Plan
Airport Reduction Feasibility Study
|
|
M&O
|
AIP
|
Need Created
|
$600,000
| 7/17/2026 | |
|
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
|
Short
|
Sponsor
|
Stimulus
|
Need Created
|
$75,000
| 3/24/2022 | |
|
Other Projects: OT CC OB : Remove Obstructions
Brush Cutting
|
Short
|
Other
|
AIP
|
Need Created
|
$0
| 4/7/2026 | |
|
Runway Projects: RE RW LI : Rehabilitate Runway Lighting
Lighting Repairs
|
ASAP
|
Inspection
|
AIP
|
Need Created
|
$45,020
| 7/21/2026 | |
|
Runway Projects: SA RW SF : Construct/Extend Safety Area
RSA Grading on Southside of Runway
|
N/A
|
Inspection
|
AIP
|
Need Created
|
$3,489,076
| 7/21/2026 | |
|
Runway Projects: SA RW SG : Install Runway Signage/Markings
Replacement of Airfield Signs
|
Short
|
Inspection
|
AIP
|
Need Created
|
$50,000
| 7/21/2026 | |
|
Construct Passenger Shelter
Construct Passenger Shelter
|
Long
|
Community
|
N/A
|
Need Created
|
| 3/31/2022 | |
|
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Grader (Replace 30674)
|
Mid
|
M&O
|
AIP
|
Obligated Need
|
$460,000
| 9/3/2026 | |
|
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Marking & Crack Seal (2024)
|
Short
|
Inspection
|
AIP
|
Obligated Need
|
$66,587
| 7/20/2026 | |
|
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Marking & Crack Seal (2028)
|
Mid
|
M&O
|
AIP
|
Programmed Need
|
$100,000
| 7/20/2026 | |
| | | | | |
Total
| | |