Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

NENANA MUNI: AIP Grants

Base Information
Owner: CITY OF NENANA
NPIAS: 02-0191
Airport Use: Public
Type: Airport
FAA Associated City: NENANA
DOT&PF Region: ---
DOT Owned: False
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 22
Total Number of Grant Work Codes: 50 Total Grants: $16,208,144.00
Total Number of Open Grant Work Codes: 8 Total Open Grants: $2,713,164.00
Total Number of Closed Grant Work Codes: 42 Total Closed Grants: $13,494,980.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2024 3-02-0191-022-2024 ST EQ SN Acquire Snow Removal Equipment $610,528
2024 3-02-0191-023-2024 ST EQ SN Acquire Snow Removal Equipment $278,235
2022 3-02-0191-019-2022 CV RG GN General ARPA 1/19/2022 $22,000
2022 3-02-0191-021-2022 RC RW LI Reconstruct Runway Lighting 9/9/2022 $350,000
2022 3-02-0191-021-2022 RS RW IM Seal Runway Pavement Surface/Pavement Joints 9/9/2022 $993,401
2021 3-02-0191-017-2021 CV CR GN CRRSA Act Funds 4/20/2021 $9,000
2021 3-02-0191-018-2021 PL MA NP Develop New Airport Master Plan or Study 9/24/2021 $450,000
2020 3-02-0191-016-2020 CV CA RE CARES Act Funds 6/3/2020 $0
2012 3-02-0191-015-2012 OT OT FF Construct Fuel Farm Replace Fuel Tank with Fuel Depot 9/19/2012 6/25/2013 $153,558
2010 3-02-0191-014-2010 SA EQ RF Acquire Safety and/or Security Equipment Perimeter Fencing 7/1/2010 6/21/2011 $736,900
2010 3-02-0191-014-2010 RE RW IM Rehabilitate Runway 04L/22R (Construction) 7/1/2010 6/21/2011 $634,702
2007 3-02-0191-013-2007 RE RW IM Rehabilitate Runway 04L/22R (Design) 8/28/2007 12/20/2012 $33,074
2007 3-02-0191-012-2007 ST EQ SN Acquire Snow Removal Equipment 6/13/2007 6/17/2008 $253,705
2007 3-02-0191-013-2007 ST EQ SE Install Perimeter Fencing (Design) 8/28/2007 12/20/2012 $25,000
2005 3-02-0191-011-2005 ST EQ SN Acquire Snow Removal Equipment 6/14/2005 3/12/2007 $191,546
2004 3-02-0191-010-2004 ST BD SN Construct Snow Removal Equipment Building 8/28/2004 5/10/2006 $917,749
2003 3-02-0191-009-2003 ST RW SF Improve Runway Safety Area 3L-21R 7/9/2003 5/30/2006 $750,000
2003 3-02-0191-008-2003 ST EQ SN Acquire Snow Removal Equipment 6/27/2003 5/17/2005 $386,368
2003 3-02-0191-009-2003 RE RW IM Rehabilitate Runway 3L-21R 7/9/2003 5/30/2006 $3,369,291
2000 3-02-0191-007-2000 RE RW IM Rehabilitate Runway 4L/22R 9/6/2000 8/23/2004 $336,603
1992 3-02-0191-006-1992 ST EQ SN Acquire Snow Removal Equipment 9/24/1992 10/16/1996 $126,562
1992 3-02-0191-006-1992 SA EQ SE Acquire Security Equipment 9/24/1992 10/16/1996 $127,067
1992 3-02-0191-006-1992 SA EQ SE Acquire Security Equipment 9/24/1992 10/16/1996 $164,658
1992 3-02-0191-006-1992 SA EQ SE Acquire Security Equipment 9/24/1992 10/16/1996 $0
1992 3-02-0191-006-1992 ST RW LI Install Runway Lighting 9/24/1992 10/16/1996 $66,408
1992 3-02-0191-006-1992 ST RW LI Install Runway Lighting 9/24/1992 10/16/1996 $112,768
1992 3-02-0191-006-1992 RE RW IM Rehabilitate Runway 03/21 9/24/1992 10/16/1996 $69,502
1987 3-02-0191-005-1987 RE AP IM Rehabilitate Apron 9/22/1987 12/17/1990 $129,326
1987 3-02-0191-005-1987 ST RW LI Install Runway Lighting 9/22/1987 12/17/1990 $36,254
1987 3-02-0191-005-1987 ST AP IM Expand Apron 9/22/1987 12/17/1990 $137,370
1987 3-02-0191-005-1987 ST OT IM Improve Airport Drainage 9/22/1987 12/17/1990 $4,546
1987 3-02-0191-005-1987 ST EQ SN Acquire Snow Removal Equipment 9/22/1987 12/17/1990 $180,258
1987 3-02-0191-005-1987 RE TW IM Rehabilitate Taxiway 9/22/1987 12/17/1990 $37,872
1987 3-02-0191-005-1987 RE TW IM Rehabilitate Taxiway 9/22/1987 12/17/1990 $64,825
1987 3-02-0191-005-1987 RE RW IM Rehabilitate Runway 3L/21R 9/22/1987 12/17/1990 $352,802
1986 3-02-0191-004-1986 ST EQ SN Acquire Snow Removal Equipment 9/24/1986 5/23/1990 $22,523
1986 3-02-0191-004-1986 ST RW IM Extend Runway 3/21 9/24/1986 5/23/1990 $1,980,955
1985 3-02-0191-003-1985 ST OT IM Improve Airport Drainage 9/23/1985 12/10/1990 $97,393
1985 3-02-0191-003-1985 ST AP LI Install Apron Lighting 9/23/1985 12/10/1990 $56,053
1985 3-02-0191-003-1985 ST EQ MS Acquire Aircraft Rescue & Fire Fighting Safety Equipment 9/23/1985 12/10/1990 $118,026
1983 3-02-0191-002-1983 ST LA DV Acquire Land for Development 3/21 9/28/1983 7/21/1986 $69,722
1983 3-02-0191-002-1983 ST EQ MS Acquire Aircraft Rescue & Fire Fighting Safety Equipment 9/28/1983 7/21/1986 $27,889
1983 3-02-0191-002-1983 ST EQ MS Acquire Aircraft Rescue & Fire Fighting Safety Equipment 9/28/1983 7/21/1986 $5,578
1983 3-02-0191-002-1983 ST RW CO Construct Runway 3/21 9/28/1983 7/21/1986 $915,237
1983 3-02-0191-002-1983 OT GT SV Improve Service Road 9/28/1983 7/21/1986 $146,693
1983 3-02-0191-002-1983 ST RW IM Extend Runway 3/21 9/28/1983 7/21/1986 $44,623
1982 3-02-0191-001-1982 ST TW CO Construct Taxiway 9/28/1982 5/19/1986 $45,938
1982 3-02-0191-001-1982 CA AP EX Expand Apron 9/28/1982 5/19/1986 $207,281
1982 3-02-0191-001-1982 ST OT IM Improve Airport Drainage 9/28/1982 5/19/1986 $190,762
1982 3-02-0191-001-1982 ST RW CO Construct Runway 03/21 9/28/1982 5/19/1986 $167,593