Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Links
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Communities
Contacts
GULKANA
:
Airport Needs List
Base Information
Owner:
ALASKA DOT&PF NORTHERN REGION
NPIAS:
02-0110
Airport Use:
Public
Type:
Airport
FAA Associated City:
GULKANA
DOT&PF Region:
Northern
DOT Owned:
True
Facility Status:
Active
Filter +/-
Needs Funding Source:
Select All
AIP
IARF
M&O Operating
Stimulus
N/A
Status:
All (Excludes Closed)
Need Created
In Project
Closed
Need Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
M&O Activity:
Select All
Aircraft Rescue & Firefighting Equipment
Buildings
Crack Sealing
Drainage Maintenance & Repair
Dust Control
Embankment Stabilization
Erosion Control
Fence and Gate Repair/Replacement/Installation
Flexible Threshold Markers
Lighting Repair/Replacement
Minor Gravel Resurfacing
Minor Pavement Repair
Obstruction Removal
Pavement Markings
Runway Grading
Safety Areas
Snow Removal Equipment
Stability Control
Vegetation Control
Replacement of Visual Aids
ASAP Needs Total:
$0
Short Term Needs Total:
$535,938
Mid Term Needs Total:
$5,000,000
Long Term Needs Total:
All Needs Total:
$5,535,938
Needs in Project Total:
$560,938
Number of Needs:
7
Number of Needs in Project:
3
Needs List
Needs
Priority
Need Origination
Funding Source
Status
Estimated Cost
Last Edit Date
Last Verified Date
Acquire Snow Blower
Acquire Snow Blower
Short
M&O
AIP
In Project
$400,000
10/5/2023
Construct New Apron
Construct New Apron
Mid
Inspection
AIP
Need Created
$4,900,000
3/31/2022
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
Short
Sponsor
Stimulus
Need Created
$75,000
3/24/2022
Construct Tie-Downs
Construct Tie-Downs
Long
Community
N/A
Need Created
3/31/2022
Construct Toilet Facilities
Construct Toilet Facilities
Long
Community
N/A
Need Created
3/31/2022
Pavement Marking & Crack Seal
Pavement Marking & Crack Seal
Short
M&O
AIP
Obligated Need
$60,938
1/22/2023
Runway Projects: ST RW IM : Strengthen Runway
Pavement Marking & Crack Seal (2028)
Mid
M&O
AIP
Programmed Need
$100,000
2/3/2025
Total
$5,535,938