Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

FAIRBANKS INTL: AIP Grants

Base Information
Owner: STATE OF ALASKA DOTPF
NPIAS: 02-0096
Airport Use: Public
Type: Airport
FAA Associated City: FAIRBANKS
DOT&PF Region: Northern
DOT Owned: True
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 69
Total Number of Grant Work Codes: 112 Total Grants: $229,393,296.00
Total Number of Open Grant Work Codes: 27 Total Open Grants: $51,681,240.00
Total Number of Closed Grant Work Codes: 85 Total Closed Grants: $177,712,056.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2024 3-02-0096-070-2024 ST EQ SN Acquire Snow Removal Equipment 8/13/2024 $806,635
2024 3-02-0096-071-2024 RC TE IN Reconstruct Passenger Boarding Bridges 7/31/2024 $2,375,000
2024 3-02-0096-072-2024 RE RW LI Rehabilitate Runway Lighting 9/6/2024 $2,354,169
2023 3-02-0096-067-2023 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Safety Equipment 8/9/2023 $937,500
2023 3-02-0096-067-2023 ST EQ SN Acquire Snow Removal Equipment 8/9/2023 $945,181
2023 3-02-0096-068-2023 RC AP IM Reconstruct Apron 5/25/2023 $7,854,380
2023 3-02-0096-068-2023 RC TW IM Reconstruct Taxiway 5/25/2023 $1,588,006
2023 3-02-0096-068-2023 RC TW LI Reconstruct Taxiway Lighting 5/25/2023 $264,668
2023 3-02-0096-069-2023 RC AP IM Reconstruct Apron 6/14/2023 $6,326,555
2023 3-02-0096-069-2023 RC TW IM Reconstruct Taxiway 6/14/2023 $1,224,494
2023 3-02-0096-069-2023 RC TW LI Reconstruct Taxiway Lighting 6/14/2023 $204,082
2022 3-02-0096-063-2022 CV RG GN General ARPA 12/14/2021 $6,360,663
2022 3-02-0096-064-2022 CV RG LC Large Concessions 1/7/2022 $96,365
2022 3-02-0096-064-2022 CV RG SC Small Concessions 1/7/2022 $385,458
2022 3-02-0096-065-2022 ST EQ SN Acquire Snow Removal Equipment 6/10/2022 $1,671,431
2022 3-02-0096-066-2022 EN OT MT Environmental Mitigation 8/31/2022 $1,209,268
2021 3-02-0096-062-2021 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle 7/28/2021 $1,162,296
2021 3-02-0096-060-2021 CV CR GN CRRSA Act Funds 4/26/2021 $3,687,400
2021 3-02-0096-061-2021 CV CR CN CRRSA Act Concessions 5/6/2021 $120,456
2020 3-02-0096-059-2020 RC RW LI Reconstruct Runway Lighting 9/4/2020 $937,500
2020 3-02-0096-059-2020 RE TW IM Rehabilitate Taxiway 9/4/2020 $2,156,250
2020 3-02-0096-059-2020 RC RW SH Shift or Reconfigure Existing Runway 9/4/2020 $5,212,689
2020 3-02-0096-059-2020 RC TW SH Shift or Reconfigure Existing Taxiway 9/4/2020 $750,000
2020 3-02-0096-058-2020 ST EQ SN Acquire Snow Removal Equipment 5/27/2020 $1,246,172
2020 3-02-0096-059-2020 SE EQ SE Install Perimeter Fencing required by 49 CFR 1542 9/4/2020 $187,500
2020 3-02-0096-059-2020 RC TW LI Reconstruct Taxiway Lighting 9/4/2020 $281,250
2019 3-02-0096-054-2019 ST OT SG Install Airfield Guidance Signs 9/23/2019 3/11/2022 4/25/2022 $1,488,437
2019 3-02-0096-056-2019 ST EQ SN Acquire Snow Removal Equipment Snow Removal Equipment - Runway Brooms (2) 7/31/2019 8/1/2022 $1,335,872
2019 3-02-0096-057-2019 PL PL AC Conduct Ground Transportation Study Ground Transportation Study 9/9/2019 10/26/2020 $82,875
2018 3-02-0096-053-2018 ST EQ SN Acquire Snow Removal Equipment Snow Removal Equipment 9/5/2018 11/2/2020 4/1/2021 $1,201,044
2018 3-02-0096-055-2018 PL PL MA Update Airport Master Plan Study GA Master Plan Phase 2 9/21/2018 4/14/2021 1/5/2022 $79,688
2017 3-02-0096-051-2017 PL PL MA Update Airport Master Plan Study Update Master Plan (GA side) 8/15/2017 1/12/2021 11/23/2021 $375,000
2017 3-02-0096-052-2017 RC TW IM Reconstruct Taxiway Taxiway B Reconstruction 9/14/2017 7/9/2021 11/29/2021 $142,550
2017 3-02-0096-049-2017 SA EQ SE Security Enhancements Security Upgrades (fencing, gates, CCTV) Phase 2 6/16/2017 10/22/2020 5/21/2021 $751,514
2017 3-02-0096-050-2017 ST EQ SN Acquire Snow Removal Equipment Deicing vehicle 7/11/2017 2/13/2020 $363,673
2017 3-02-0096-050-2017 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle Rescue Boat 7/11/2017 2/13/2020 $64,000
2017 3-02-0096-052-2017 RC TW LI Reconstruct Taxiway Lighting Reconstruct t/w B lighting 9/14/2017 7/9/2021 11/29/2021 $2,516,258
2016 3-02-0096-047-2016 SA EQ RF Acquire Safety and/or Security Equipment Security Upgrade fencing, gates, signage, CCTV 9/12/2016 5/25/2021 8/2/2021 $3,376,008
2016 3-02-0096-048-2016 ST EQ SN Acquire Snow Removal Equipment Snow Removal Equipment 9/14/2016 3/7/2019 $594,169
2015 3-02-0096-046-2015 ST EQ SN Acquire Snow Removal Equipment Snow Removal Equipment 7/1/2015 7/26/2019 $1,468,520
2014 3-02-0096-045-2014 ST EQ SN Acquire Snow Removal Equipment 8/27/2014 1/13/2017 $210,077
2014 3-02-0096-044-2014 ST BD SN Construct Sand and Chemical Storage Building Phase 2 8/27/2014 11/20/2020 4/14/2021 $2,342,943
2014 3-02-0096-044-2014 SA BD EX Improve Aircraft Rescue & Fire Fighting Building Upgrade ARFF Bldg -ph2 8/27/2014 11/20/2020 4/14/2021 $8,139,102
2013 3-02-0096-042-2013 SA BD EX Improve Aircraft Rescue & Fire Fighting Building Upgrade ARFF Bldg 9/12/2013 11/20/2020 8/16/2021 $4,500,000
2013 3-02-0096-042-2013 ST BD SN Construct Sand and Chemical Storage Building Construct Sand/Deicer Storage Bldg 9/12/2013 11/20/2020 8/16/2021 $5,597,015
2012 3-02-0096-041-2012 RE AP IM Rehabilitate Apron Phase 2 9/13/2012 5/11/2017 $1,023,762
2011 3-02-0096-040-2011 RE AP IM Rehabilitate Apron Rehabilitate Apron 9/14/2011 7/8/2015 $6,000,085
2011 3-02-0096-040-2011 OT EQ MS Acquire Interactive Training System Interactive Training System 9/14/2011 7/8/2015 $350,000
2010 3-02-0096-038-2010 PL PL GI Collect airport data for Airports Geographic Information System 7/19/2010 7/19/2017 $694,409
2010 3-02-0096-039-2010 PL PL MA Update Airport Master Plan Study Update MP 8/6/2010 12/7/2016 $879,230
2009 3-02-0096-037-2009 SA EQ RF Acquire Safety and/or Security Equipment Access Control (ARRA funded) 9/10/2009 4/11/2012 $0
2009 3-02-0096-036-2009 SA BD EX Improve Aircraft Rescue & Fire Fighting Building 9/3/2009 1/7/2013 $1,939,577
2008 3-02-0096-034-2008 RE RW IM Rehabilitate Runway 01L/19R (Phase 2) 6/20/2008 2/11/2013 $17,291,607
2008 3-02-0096-035-2008 RE RW IM Rehabilitate Runway 01L/19R (Phase 3) 9/11/2008 3/11/2014 $5,967,638
2007 3-02-0096-033-2007 RE RW IM Rehabilitate Runway 01L/19R (Phase 1) 9/12/2007 12/28/2012 $16,167,640
2006 3-02-0096-032-2006 SA TW LI Install Taxiway Lighting (Centerline for Alpha & Bravo) 8/15/2006 5/4/2010 $250,000
2006 3-02-0096-032-2006 ST AP CO Construct Apron (Construction) 8/15/2006 5/4/2010 $16,777,001
2006 3-02-0096-032-2006 ST AP CO Construct Apron (Multi-yeared in 2006) 8/15/2006 5/4/2010 $3,509,407
2006 3-02-0096-032-2006 RE RW IM Rehabilitate Runway 01R/19L 8/15/2006 5/4/2010 $1,000,000
2004 3-02-0096-031-2004 RE TW IM Rehabilitate Taxiway 8/24/2004 7/1/2008 $11,081,128
2004 3-02-0096-030-2004 ST AP IM Expand Apron 8/12/2004 3/12/2007 $601,665
2003 3-02-0096-027-2003 ST OT IM Improve Airport Drainage East Side 7/10/2003 5/17/2005 $493,901
2003 3-02-0096-029-2003 EN OT DI Construct Deicing Containment Facility (North) 8/29/2003 9/6/2007 $2,069,333
2003 3-02-0096-029-2003 RE TW IM Rehabilitate Taxiway A 8/29/2003 9/6/2007 $12,446,065
2003 3-02-0096-028-2003 ST TE IM Rehabilitate Terminal Building 8/19/2003 3/9/2007 $1,389,925
2002 3-02-0096-025-2002 SE SE SE Security Enhancements 6/18/2002 2/14/2005 $260,500
2002 3-02-0096-026-2002 SE SE SE Security Enhancements 7/18/2002 1/24/2006 $311,400
2001 3-02-0096-024-2001 ST OT IM Improve Airport Drainage 8/16/2001 9/10/2003 $457,370
2001 3-02-0096-023-2001 ST RW IM Extend Runway 9/25/2001 7/29/2005 $8,510,474
2001 3-02-0096-023-2001 ST SB CO Improve Seaplane Base 9/25/2001 7/29/2005 $2,120,400
2000 3-02-0096-022-2000 ST TE IM Improve Terminal Building 7/14/2000 9/10/2003 $1,320,705
2000 3-02-0096-021-2000 PL PL MS Conduct Miscellaneous Study 9/8/2000 8/23/2004 $170,000
2000 3-02-0096-021-2000 EN PL NO Conduct Noise Compatibility Plan Study 9/8/2000 8/23/2004 $110,000
2000 3-02-0096-021-2000 PL PL MA Conduct Airport Master Plan Study 9/8/2000 8/23/2004 $347,360
1999 3-02-0096-018-1999 SA EQ SE Acquire Security Equipment 3/25/1999 9/26/2002 $342,054
1999 3-02-0096-020-1999 EN LA 65 Acquire Land for Noise Compatibility within 65 - 69 DNL 8/3/1999 8/29/2001 $349,846
1999 3-02-0096-018-1999 ST TE IM Improve Terminal Building 3/25/1999 9/26/2002 $410,800
1999 3-02-0096-019-1999 ST TE IM Improve Terminal Building 8/3/1999 9/10/2003 $626,653
1999 3-02-0096-018-1999 EN OT MT Environmental Mitigation 3/25/1999 9/26/2002 $565,000
1998 3-02-0096-017-1998 EN OT MT Environmental Mitigation 7/15/1998 9/20/2001 $991,124
1998 3-02-0096-017-1998 ST TW IM Extend Taxiway 7/15/1998 9/20/2001 $965,000
1998 3-02-0096-017-1998 SA EQ SE Acquire Security Equipment 7/15/1998 9/20/2001 $85,000
1998 3-02-0096-017-1998 ST EQ SN Acquire Snow Removal Equipment 7/15/1998 9/20/2001 $320,000
1998 3-02-0096-017-1998 PL PL MS Conduct Miscellaneous Study 7/15/1998 9/20/2001 $134,578
1997 3-02-0096-016-1997 CA RW EX Extend Runway 01/19 4/22/1997 9/27/2002 $1,976,250
1997 3-02-0096-016-1997 ST TW IM Extend Taxiway 4/22/1997 9/27/2002 $658,750
1997 3-02-0096-016-1997 ST RW SF Improve Runway Safety Area 1L-19 4/22/1997 9/27/2002 $1,369,244
1997 3-02-0096-016-1997 ST AP LI Install Apron Lighting 4/22/1997 9/27/2002 $50,000
1997 3-02-0096-016-1997 ST OT IN Install Miscellaneous NAVAIDS 4/22/1997 9/27/2002 $575,000
1997 3-02-0096-016-1997 SA RW LI Install Runway Lighting 1L-19 4/22/1997 9/27/2002 $150,352
1996 3-02-0096-015-1996 ST OT IN Install Miscellaneous NAVAIDS 6/7/1996 9/27/2002 $2,429,314
1996 3-02-0096-015-1996 OT GT SV Improve Service Road 6/7/1996 9/27/2002 $126,094
1996 3-02-0096-015-1996 ST TW IM Extend Taxiway 6/7/1996 9/27/2002 $744,592
1996 3-02-0096-015-1996 CA RW EX Extend Runway 1L/19R 6/7/1996 9/27/2002 $2,826,612
1994 3-02-0096-012-1994 EN LA 75 Acquire Land for Noise Compatibility within 75 DNL 9/28/1994 9/9/1997 $3,159,015
1993 3-02-0096-009-1993 SA EQ SE Acquire Security Equipment 9/17/1993 1/26/2000 $1,065,878
1993 3-02-0096-010-1993 SA RW SF Improve Runway Safety Area RW01/19 9/16/1993 12/1/1998 $346,589
1993 3-02-0096-008-1993 SA OT SG Install Airfield Guidance Signs 7/26/1993 3/15/2000 $438,785
1993 3-02-0096-011-1993 RE TW LI Rehabilitate Taxiway Lighting 9/20/1993 7/19/2000 $51,112
1993 3-02-0096-011-1993 RE RW LI Rehabilitate Runway Lighting 9/20/1993 7/19/2000 $648,264
1992 3-02-0096-007-1992 SA EQ SE Acquire Security Equipment 7/13/1992 4/17/2000 $411,367
1991 3-02-0096-006-1991 PL PL MA Conduct Airport Master Plan Study 9/10/1991 9/9/1997 $247,719
1991 3-02-0096-005-1991 ST AP CO Construct Apron 9/12/1991 7/14/1999 $1,432,147
1991 3-02-0096-005-1991 RE TW IM Rehabilitate Taxiway 9/12/1991 7/14/1999 $472,994
1989 3-02-0096-004-1989 ST AP CO Construct Apron 9/13/1989 2/8/1993 $47,311
1989 3-02-0096-004-1989 ST TW CO Construct Taxiway 9/13/1989 2/8/1993 $1,305,239
1987 3-02-0096-002-1987 EN PL NO Conduct Noise Compatibility Plan Study 11/7/1986 3/2/1995 $236,859
1987 3-02-0096-003-1987 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle 9/15/1987 6/11/1990 $469,890
1985 3-02-0096-001-1985 ST TW IM Extend Taxiway 8/9/1985 9/20/1988 $300,918
1985 3-02-0096-001-1985 SP RW FR Groove Runway 1L/19R 8/9/1985 9/20/1988 $430,262
1985 3-02-0096-001-1985 RE RW IM Rehabilitate Runway 1L/19R 8/9/1985 9/20/1988 $2,392,687
1985 3-02-0096-001-1985 RE TW IM Rehabilitate Taxiway 8/9/1985 9/20/1988 $1,725,302