Airport Safety Measures
|
Performance Measure |
Metric Definition |
To Meet the Measure |
Current Condition |
Meets Measure |
Primary Runway Length |
Primary runway length must be longer than 3,300' for Community Class or 5,000' for Regionals and Hubs. |
3,300 |
4,500 |
|
|
Primary Runway Condition |
Primary runway condition must meet Good for gravel surfaces and at least a 70 PCI rating for paved surfaces |
70+ PCI or Good+ rating |
Good |
|
|
Primary Runway Lighting |
Primary runway has high intensity lighting for Hubs and Regional classes or medium intensity lighting for Community and Local High classes. |
MIRL |
MIRL |
|
|
Primary Runway ALS or REIL |
Primary runway has Runway End Identifier Lights or Approach Lighting System. |
Not UNK or NSTD |
Not UNK or NSTD |
|
|
Wind Coverage > 95% and/or Crosswind |
Primary runway wind coverage is greater than 95% and/or facility has a crosswind runway. |
Yes or Wind Coverage > 95% |
>95% |
|
|
Certified Weather Reporting |
Airport has certified weather reporting onsite. |
ASOS, AWSS, AWOS |
AWOS |
|
|
Weather Camera |
Airport has FAA weather camera onsite. |
Yes |
No |
|
|
Seasonal Closures |
A seasonal closure is considered more than 48 hours closed and reoccurring in multiple years. |
None |
None |
|
|
Community: Economic Development
|
Performance Measure |
Metric Definition |
To Meet the Measure |
Current Condition |
Meets Measure |
Fuel Available |
Facility has fuel available for purchase. |
Yes |
No |
|
|
Documented Need for Additional Lease Lots |
Facility has documented need for additional lease lots. |
No |
No |
|
Comment: |
|
|
Documented Need for Aircraft or Vehicle Parking |
Facility has documented need for additional aircraft and/or vehicle parking. |
No |
No |
|
|
Unmanned Aerial System (UAS) Integration |
Facility includes UAS corridor, with plans for unmanned activity in the future. |
Yes |
No |
|
|
Broadband Connectivity Available |
Community has broadband connectivity (100mb per sec or higher) through a local fiber connection. |
Yes |
No |
|
|