Base Information
Owner: ALASKA DOT&PF SOUTHCOAST REGION
NPIAS: 02-0001
Airport Use: Public
Type: Airport
FAA Associated City: ADAK ISLAND
DOT&PF Region: Southcoast
DOT Owned: True
Facility Status: Active
Filter +/-
Needs Funding Source:
Status:
Need Category:
M&O Activity:
 
ASAP Needs Total:   Short Term Needs Total:
Mid Term Needs Total: Long Term Needs Total:
All Needs Total: Needs in Project Total:
Number of Needs: Number of Needs in Project:
 
Needs List
NeedsPriorityNeed OriginationFunding SourceStatusEstimated CostLast Edit DateLast Verified Date
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Replace Broom with 4600 Tracking Broom
Short State Equipment Fleet (SEF) AIP Constructed/Purchased $411,540 5/19/2026 
Procure AFFF Testing Equipment
Procure AFFF Testing Equipment
ASAP FAA Initiatives AIP Constructed/Purchased $24,000 5/6/2026 
Equipment, Security, and Fencing: RC EQ RF : Reconstruct Aircraft Rescue and Fire Fighting Vehicle
Purchase New 3,00 gal. ARFF Truck
ASAP State Equipment Fleet (SEF) AIP In Project $1,000,000 5/19/2026 
Master Plan Update
Master Plan Update
ASAP Community AIP In Project $927,000 2/8/2021 
Reconstruct Apron Lighting
Reconstruct Apron Lighting
Mid M&O AIP In Project $317,185 10/10/2022 
Reconstruct Runway Lighting
Reconstruct Runway Lighting
Short M&O AIP In Project $593,771 10/10/2022 
Reconstruct Taxiway Lighting
Reconstruct Taxiway Lighting
Mid M&O AIP In Project $524,413 10/10/2022 
Rehabilitate Taxiway A
Rehabilitate Taxiway A
Short Inspection AIP In Project $10,681,421 10/10/2022 
Runway Projects: RE RW IM : Rehabilitate Runway
Rehabilitate Runway 5/23
Mid Inspection AIP In Project $19,428,765 4/27/2026 
Taxiway Projects: RE TW IM : Rehabilitate Taxiway
Painted Markings
Short M&O AIP In Project $60,000 4/20/20262/10/2026
Equipment, Security, and Fencing: EN EQ MT : Environmental Mitigation
Replace Water Pumps
Mid M&O M&O Operating Need Created $999,999 12/15/2025 
Fence Repairs
Fence Repairs
Long Inspection AIP Need Created $68,654 4/19/2022 
Fence: SA FE WH : Install Wildlife Perimeter Fencing
ADK Fence
Long Other AIP Need Created $3,999,999 2/24/2025 
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
Short Sponsor Stimulus Need Created $75,000 3/24/2022 
RSA Drainage improvements
RSA Drainage improvements
Mid Inspection AIP Need Created $160,000 4/19/2022 
SREB Repairs
SREB Repairs
Short Inspection AIP Need Created $1,767,048 4/19/2022 
Installation of FAA Weather Cameras
Installation of FAA Weather Cameras
N/A Other N/A Need Created 7/26/2023 
Equipment, Security, and Fencing: SA EQ RF : Acquire Safety and/or Security Equipment
Acquire Replacement Water Rescue Rafts
Short Letter of Compliance AIP Obligated Need $36,392 5/19/2026 
Equipment: ST EQ SN: Acquire Snow Removal Equipment
Adak Loader
Short State Equipment Fleet (SEF) AIP Obligated Need $456,290 4/22/2026 
Equipment: ST EQ SN: Acquire Snow Removal Equipment
Replace Truck
Short M&O AIP Obligated Need $500,000 4/22/2026 
Replace 8 yd 4x6
Replace 8 yd 4x6
Mid M&O AIP Obligated Need $440,212 2/3/2023 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Markings (2025)
ASAP Inspection AIP Obligated Need $99,000 5/18/2026 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Markings (2028)
Mid M&O AIP Programmed Need $160,000 2/7/2025 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Markings (2027)
Mid M&O AIP Programmed Need $100,000 9/17/2025 
Runway Projects: RE RW IM : Rehabilitate Runway
Painted Markings 2029
Short M&O AIP Verified Need $114,000 2/2/20262/10/2026
      Total   