Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

TALKEETNA: AIP Grants

Base Information
Owner: ALASKA DOT&PF CENTRAL REGION
NPIAS: 02-0287
Airport Use: Public
Type: Airport
FAA Associated City: TALKEETNA
DOT&PF Region: Central
DOT Owned: True
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 13
Total Number of Grant Work Codes: 35 Total Grants: $19,192,228.00
Total Number of Open Grant Work Codes: 4 Total Open Grants: $1,425,000.00
Total Number of Closed Grant Work Codes: 31 Total Closed Grants: $17,767,228.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2024 3-02-0287-006-2024 ST EQ SN Acquire Snow Removal Equipment 7/15/2024 $1,218,750
2024 3-02-0287-007-2024 RS AP IM Reseal Apron Pavement 8/5/2024 $42,188
2024 3-02-0287-007-2024 RS RW IM Reseal/Resurface Runway Pavement 8/5/2024 $112,500
2024 3-02-0287-007-2024 RS TW IM Reseal Taxiway Pavement 8/5/2024 $51,562
2016 3-02-0287-005-2016 RE TW IM Rehabilitate Taxiway Phase 2 5/31/2016 7/8/2020 4/12/2021 $966,433
2016 3-02-0287-005-2016 ST OT OB Remove Obstructions Remove obstructions - lateral transition surface - 19.7 acres. 5/31/2016 7/8/2020 4/12/2021 $88,994
2016 3-02-0287-005-2016 RE AP IM Rehabilitate Apron Phase 2 5/31/2016 7/8/2020 4/12/2021 $1,262,625
2016 3-02-0287-005-2016 RE RW IM Rehabilitate Runway 18/36 Phase 2 5/31/2016 7/8/2020 4/12/2021 $1,411,317
2016 3-02-0287-005-2016 ST LA SZ Acquire Land For Approaches 5/31/2016 7/8/2020 4/12/2021 $210,375
2016 3-02-0287-005-2016 ST AP CO Construct Apron Phase 2 5/31/2016 7/8/2020 4/12/2021 $1,483,882
2016 3-02-0287-005-2016 ST TW CO Construct Taxiway Construct TW G, H, J to support apron construction project. 1,319 linear feet of new taxiway. 5/31/2016 7/8/2020 4/12/2021 $1,091,954
2015 3-02-0287-004-2015 OT GT AC Construct Access Road 9/16/2015 7/7/2020 4/14/2021 $2,500,000
2015 3-02-0287-004-2015 ST AP CO Construct Apron Construct transient and GA apron, phase 1 9/16/2015 7/7/2020 4/14/2021 $1,181,327
2015 3-02-0287-004-2015 RE RW IM Rehabilitate Runway 18/36 Phase 1 9/16/2015 7/7/2020 4/14/2021 $701,094
2015 3-02-0287-004-2015 ST TW CO Construct Taxiway 9/16/2015 7/7/2020 4/14/2021 $700,000
2015 3-02-0287-004-2015 ST OT OB Remove Obstructions Remove trees & brush 9/16/2015 7/7/2020 4/14/2021 $344,541
2015 3-02-0287-004-2015 RE AP IM Rehabilitate Apron Phase 1 9/16/2015 7/7/2020 4/14/2021 $500,000
2015 3-02-0287-004-2015 RE TW IM Rehabilitate Taxiway Phase 1 9/16/2015 7/7/2020 4/14/2021 $573,038
2014 3-02-0200-098-2014 RE RW IM [Various Grant] Rehabilitate Runway 18/36 (+08J) Various Surface Preservation Maintenance: Talkeetna - Pavement Markings and Crack Seal 9/19/2014 11/30/2021 2/16/2022 $63,000
2012 3-02-0200-084-2012 SA OT OB [Various Grant] Remove Obstructions Remove Obstructions (Various - Talkeetna) 7/23/2012 2/6/2019 $63,000
2010 3-02-0200-073-2010 RE RW IM [Various Grant] Rehabilitate Runway 18/36 Talkeetna Various Surface Maintenance 3/12/2010 12/9/2015 $106,685
2009 3-02-0200-069-2009 RE RW IM [Various Grant] Rehabilitate Runway 18/36 (Various Surface Maintenance) 8/20/2009 12/19/2014 $16,031
2008 3-02-0200-066-2008 RE RW IM [Various Grant] Rehabilitate Runway 18/36 (Maintenance) 6/19/2008 6/10/2014 $26,000
2005 3-02-0200-050-2005 ST EQ SN [Various Grant] Acquire Snow Removal Equipment (U-Blade) 8/19/2005 12/19/2013 $20,321
1996 3-02-0287-003-1996 ST LA DV Acquire Land for Development 7/23/1996 8/23/2000 $200,000
1996 3-02-0287-003-1996 ST TW CO Construct Taxiway 7/23/1996 8/23/2000 $1,866,312
1996 3-02-0287-003-1996 CA AP EX Expand Apron 7/23/1996 8/23/2000 $100,000
1996 3-02-0287-003-1996 ST AP LI Install Apron Lighting 7/23/1996 8/23/2000 $200,000
1996 3-02-0287-003-1996 OT GT SV Improve Service Road 7/23/1996 8/23/2000 $50,000
1996 3-02-0287-003-1996 ST BD SN Improve Snow Removal Equipment Building 7/23/1996 8/23/2000 $620,279
1995 3-02-0287-002-1995 PL PL MA Conduct Airport Master Plan Study 9/18/1995 9/24/2001 $281,250
1986 3-02-0287-001-1986 ST RW IM Extend Runway 18/36 9/11/1986 2/11/1991 $802,520
1986 3-02-0287-001-1986 ST AP IM Expand Apron 9/11/1986 2/11/1991 $235,250
1986 3-02-0287-001-1986 ST AP LI Install Apron Lighting 9/11/1986 2/11/1991 $80,000
1986 3-02-0287-001-1986 RE TW IM Rehabilitate Taxiway 9/11/1986 2/11/1991 $21,000