Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Communities
Contacts
TALKEETNA
:
Documents/Links
Links
This section contains useful links related to this airport as well as a link to the current Airport Layout Plan (ALP) file.
Name
Location
Clicks
Imagery Website
http://www.commerce.state.ak.us/dca/profiles/profile%E2%80%90maps.htm
0
Current ALP
http://dot.alaska.gov/stwdav/documents/ALP/Talkeetna_ALP.pdf
2
Nondiscrimination Policy Statement
https://dot.alaska.gov/tvi_statement.shtml
0
Accessibility
https://dot.alaska.gov/accessibility.shtml
0
Uploaded Documents
This area contains documents that are not generated by DOT&PF and automatically loaded into the eDocs database. This includes documents produced by local sponsor airports, consultants, cities, boroughs, and other agencies. To add a relevant airport document, go to the bottom of the page.
Name
Date Issued
Downloads
CR_Lighting_Improvements_10-24-2018.pdf
9
Talkeetna_Airport_Lighting_Improvements_11-2-2021.pdf
11
2022 Talkeetna Lighting APEB re-eval
2022
9
DOT&PF eDocs
This section depicts airport information that exists in the DOT&PF eDocs database and shares all files containing an airport Location ID (LOC). To update titles, dates, duplications and or type of document, please access eDocs through the
DOT&PF Employee Intranet page
. To add new documents into eDocs from this page, fill out all required information at the bottom.
Title
Date Issued
Category
Sub Category
Talkeetna (TKA) Airport Layout Plan 2005_11_01
Planning
ALP
Talkeetna Airport Improvements Final Environment Assessment
9/1/2006
Planning
Master Plan/EA
Talkeetna Airport Master Plan Appendix (2001)
9/1/2001
Planning
ALP
Talkeetna Airport Master Plan
9/1/2001
Planning
Master Plan
Talkeetna (TKA) Airport Layout Plan 1979_12_27
12/27/1979
Planning
ALP
56229 Talkeetna Airport Paving As-Builts
10/13/1988
Construction
As Builts
Talkeetna Airport PCI Inspection (2010)
Planning
Pavement Condition Report
Talkeetna (TKA) Airport Layout Plan 1989_08_23
8/23/1989
Planning
ALP
Talkeetna Airport PCI Inspection (2004)
Planning
Pavement Condition Report
Talkeetna Airport PCI Inspection (2020)
Planning
Pavement Condition Report
CFAPT00087 Talkeetna Airport Improvements
5/11/2022
Construction
As Builts
Talkeetna (TKA) Airport Layout Plan 1996_02_23
2/23/1996
Planning
ALP
Talkeetna TKA 5010 Inspection Report 2014-06-11 Ext
6/11/2014
Planning
Airport 5010 Inspection
Talkeetna Airport PCI Inspection (2007)
Planning
Pavement Condition Report
Talkeetna TKA 5010 Inspection Report 2019-08-09
8/9/2019
Planning
5010 Report
Talkeetna Airport Lighting Plan 1970 As-Builts
4/7/1970
Construction
As Builts
Talkeetna TKA RW 18-36 TERPS Inspection Report 2014-06-11
6/11/2014
Planning
Airport 5010 Inspection
Talkeetna Airport PCI Inspection (2023)
Planning
5-02-0287-01 Talkeetna Aiport Improvements As-Builts
2/11/1982
Construction
As Builts
Talkeetna TKA 5010 Inspection Report 2006-7-9
7/9/2006
Planning
Airport 5010 Inspection
Talkeetna (TKA) Airport Layout Plan 1986_10_15
10/15/1986
Planning
ALP
Talkeetna TKA 5010 Inspection Report 2010-10-8
10/8/2010
Planning
Airport 5010 Inspection
Talkeetna Airport PCI Inspection (2013)
Planning
Pavement Condition Report
Talkeetna Airport PCI Inspection (2017)
Planning
Pavement Condition Report
Talkeetna (TKA) Airport Layout Plan 2020_05_22
5/22/2020
Planning
ALP
Talkeetna Airport Improvements Phase II Draft Heliport Relocation Study
1/1/2003
Planning
Master Plan
Talkeetna (TKA) Airport Layout Plan 2010_09_16
9/16/2010
Planning
ALP
Talkeetna TKA 5010 Inspection Report 2020-09-13
9/13/2020
Planning
5010 Report
Talkeetna (TKA) Airport Pavement Condition Report
9/1/2013
Planning
Pavement Condition Report
Talkeetna Airport Improvements Phase II Draft Heliport Relocation Study
1/1/2003
Planning
Master Plan
60045 Talkeetna Airport Improvements As-Builts
11/15/1999
Construction
As Builts
Talkeetna Airport Master Plan
9/1/2001
Planning
Master Plan/EA