| Needs | Priority | Need Origination | Funding Source | Status | Estimated Cost | Last Edit Date | Last Verified Date |
|
Building Projects (other than terminals): RE BD SN : Rehabilitate Snow Removal Building
Building Projects (other than terminals): RE BD SN : Rehabilitate Snow Removal Building
|
N/A
|
Inspection
|
AIP
|
Draft Need
|
$0
| 3/9/2026 | |
|
Other Projects: CC OT OB : Remove Obstructions
Other Projects: CC OT OB : Remove Obstructions
|
N/A
|
Inspection
|
AIP
|
Draft Need
|
$0
| 3/9/2026 | |
|
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Towed RW Broom (Replace 36128)
|
Short
|
State Equipment Fleet (SEF)
|
AIP
|
In Project
|
$398,610
| 7/20/2026 | |
|
Equipment, Security, and Fencing: ST EQ IN : Install Wind Cone/Segmented Circle
Replace Power Supply to Wind Cone & Beacon
|
Mid
|
M&O
|
AIP
|
Need Created
|
$1,214,549
| 7/15/2026 | |
|
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
|
Short
|
Sponsor
|
Stimulus
|
Need Created
|
$75,000
| 3/24/2022 | |
|
Airport Terminal Repairs
Airport Terminal Repairs
|
Short
|
Community
|
N/A
|
Need Created
|
| 8/9/2023 | |
|
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Loader (Replace 35609)
|
Mid
|
M&O
|
AIP
|
Obligated Need
|
$480,000
| 9/4/2026 | |
|
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Marking & Crack Seal
|
Short
|
M&O
|
AIP
|
Programmed Need
|
$234,375
| 7/20/2026 | |
| | | | | |
Total
| | |