Needs | Priority | Need Origination | Funding Source | Status | Estimated Cost | Last Edit Date | Last Verified Date |
Acquire Loader
Acquire Loader
|
Mid
|
M&O
|
AIP
|
In Project
|
$480,000
| 3/15/2023 | |
Pavement Marking & Crack Seal
Pavement Marking & Crack Seal
|
Short
|
M&O
|
AIP
|
In Project
|
$234,375
| 1/31/2023 | |
St George Pavement Markings
St George Pavement Markings
|
Short
|
M&O
|
AIP
|
In Project
|
$91,670
| 3/17/2021 | |
St George Towed RWY Broom
St George Towed RWY Broom
|
Short
|
State Equipment Fleet (SEF)
|
AIP
|
In Project
|
$398,610
| 3/17/2021 | |
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
|
Short
|
Sponsor
|
Stimulus
|
Need Created
|
$75,000
| 3/24/2022 | |
Replace Power Supply to Wind Cone & Beacon
Replace Power Supply to Wind Cone & Beacon
|
Mid
|
M&O
|
AIP
|
Need Created
|
$1,214,549
| 2/3/2023 | |
Aircraft Tie-Downs
Aircraft Tie-Downs
|
Long
|
Community
|
N/A
|
Need Created
|
| 8/9/2023 | |
Airport Terminal Repairs
Airport Terminal Repairs
|
Short
|
Community
|
N/A
|
Need Created
|
| 8/9/2023 | |
| | | | |
Total
| | |