Needs | Priority | Need Origination | Funding Source | Status | Estimated Cost | Last Edit Date | Last Verified Date |
ALP
ALP
|
Short
|
Sponsor
|
AIP
|
In Project
|
$425,000
| 5/25/2022 | |
Apply Dust Palliative
Apply Dust Palliative
|
Short
|
Inspection
|
AIP
|
In Project
|
$0
| 1/26/2022 | |
Conduct Airport Reloacation Feasibility Study
Conduct Airport Reloacation Feasibility Study
|
Short
|
Sponsor
|
AIP
|
In Project
|
$1,000,000
| 1/19/2022 | |
Elevate Runway, Taxiway, Apron and Access Road
Elevate Runway, Taxiway, Apron and Access Road
|
ASAP
|
Inspection
|
AIP
|
In Project
|
$21,219,060
| 3/14/2019 | |
Equipment: ST EQ SN: Acquire Snow Removal Equipment
Acquire Loader (Replace 35461)
|
Mid
|
M&O
|
AIP
|
In Project
|
$328,125
| 9/27/2024 | |
Minor Gravel Resurfacing
Minor Gravel Resurfacing
|
Short
|
Other
|
AIP
|
In Project
|
$1,729,267
| 1/26/2022 | |
Reconnaissance Study
Reconnaissance Study
|
Short
|
Sponsor
|
AIP
|
In Project
|
$750,000
| 5/25/2022 | |
Install NAVAIDS
Install NAVAIDS
|
Short
|
Inspection
|
AIP
|
Need Created
|
$466,796
| 5/6/2020 | |
Construct Passenger Shelter
Construct Passenger Shelter
|
Long
|
Community
|
N/A
|
Need Created
|
| 8/17/2022 | |
Construct Tie-Downs
Construct Tie-Downs
|
|
Other
|
N/A
|
Need Created
|
| 8/17/2022 | |
Construct Toilet Facilities
Construct Toilet Facilities
|
Long
|
Community
|
N/A
|
Need Created
|
| 8/17/2022 | |
| | | | |
Total
| | |