State of Alaska official logo
dot-seal
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
aasp-logo

SCAMMON BAY: Documents/Links

 
Uploaded Documents
This area contains documents that are not generated by DOT&PF and automatically loaded into the eDocs database. This includes documents produced by local sponsor airports, consultants, cities, boroughs, and other agencies. To add a relevant airport document, go to the bottom of the page.
 
 
DOT&PF eDocs
This section depicts airport information that exists in the DOT&PF eDocs database and shares all files containing an airport Location ID (LOC). To update titles, dates, duplications and or type of document, please access eDocs through the DOT&PF Employee Intranet page. To add new documents into eDocs from this page, fill out all required information at the bottom.
DOT&PF eDocs
TitleDate IssuedCategorySub Category
Scammon Bay (SCM) Project Initiation Sheet 2019 11/25/2019 Other
Scammon Bay (SCM) Airport Layout Plan 1985_09_23 9/23/1985 Planning ALP
Scammon Bay SCM 5010 Inspection Report 2014-07-16 Ext 7/16/2014 Planning Airport 5010 Inspection
8-02-0255-01 Scammon Bay Airport Construction As-Builts 3/26/1974 Construction As Builts
Scammon Bay (SCM) Airport Layout Plan 1991_01_16 1/16/1991 Planning ALP
Scammon Bay SCM 5010 Inspection Report 2015-7-12 TERPS 12/1/2015 Planning Airport 5010 Inspection
Scammon Bay SCM 5010 Inspection Report 2023-6-7 6/7/2023 Planning 5010
57981 Scammon Bay Airport Improvements As-Builts 1/27/1993 Construction As Builts
Scammon Bay SCM 5010 Inspection Report 2015-7-12 Ext 12/1/2015 Planning Airport 5010 Inspection
Scammon Bay SCM RW 10-28 TERPS Inspection Report 2014-07-16 7/16/2014 Planning Airport 5010 Inspection
Scammon Bay (SCM) Airport Layout Plan 1978_07_14 7/14/1978 Planning ALP
Scammon Bay Airport Imrovements Environmental Assessment 5/1/1991 Planning Master Plan/EA
58357 SCAMMON FLOOD REPAIRS ASBUILT 5/10/2023 Construction As Builts
Scammon Bay SCM 5010 Inspection Report 2017-06-29 6/29/2017 Planning 5010 Inspection
Scammon Bay SCM 5010 Inspection Report 2021-06-30 6/30/2021 Planning 5010 Report
Scammon Bay SCM 5010 Inspection Report 2005-8-25 8/25/2005 Planning Airport 5010 Inspection
Scammon Bay SCM 5010 Inspection Report 2009-6-13 6/13/2009 Planning Airport 5010 Inspection
Scammon Bay (SCM) Airport Layout Plan 1991_02_08 2/8/1991 Planning ALP
Scammon Bay (SCM) Airport Layout Plan 2004_02_02 2/2/2004 Planning ALP
55790 Scammon Bay SREB As-Builts 5/1/2003 Construction As Builts