PORT LIONS: AIP Grants

Base Information
Owner: ALASKA DOT&PF SOUTHCOAST REGION
NPIAS: 02-0235
Airport Use: Public
Type: Airport
FAA Associated City: PORT LIONS
DOT&PF Region: Southcoast
DOT Owned: True
Facility Status: Active
Filter +/-
 
Grant Summary Statistics
Total Grants: 10
Total Number of Grant Work Codes: 16 Total Grants: $2,670,705.00
Total Number of Open Grant Work Codes: 4 Total Open Grants: $800,145.00
Total Number of Closed Grant Work Codes: 12 Total Closed Grants: $1,870,560.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2024 3-02-0235-005-2024 RS AP IM Reseal Apron Pavement 8/5/2024 $117,225
2024 3-02-0235-005-2024 RS RW IM Reseal/Resurface Runway Pavement 8/5/2024 $652,151
2024 3-02-0235-005-2024 RS TW IM Reseal Taxiway Pavement 8/5/2024 $9,769
2013 3-02-0200-089-2013 SA OT OB [Various Grant] Remove Obstructions Various Obstruction Removal (Port Lions) 9/18/2013 7/7/2020 $21,000
2012 3-02-0200-087-2012 RE RW IM [Various Grant] Rehabilitate Runway 07/25 Various Surface Preservation Maintenance (Port Lions) 9/19/2012 1/9/2019 $89,250
2011 3-02-0235-004-2011 RE RW LI Rehabilitate Runway Lighting 07/25 Regulator Bldg 3/17/2011 1/20/2015 $186,043
2007 3-02-0200-060-2007 RE RW IM [Various Grant] Rehabilitate Runway 06/24 (Maintenance) 5/31/2007 8/6/2013 $63,840
2006 3-02-0200-056-2006 RE RW IM [Various Grant] Rehabilitate Runway 06/24 (Maintenance) 6/30/2006 2/27/2012 $73,810
2005 3-02-0200-052-2005 RE RW IM [Various Grant] Rehabilitate Runway 06/24 (Maintenance) 8/30/2005 6/9/2010 $40,000
2003 3-02-0235-003-2003 PL PL MA Conduct Airport Master Plan Study Phase 2 8/22/2003 7/27/2007 $282,659
2002 3-02-0235-002-2002 PL PL MA Conduct Airport Master Plan Study Phase 1 5/13/2002 5/17/2005 $84,573
1983 3-02-0235-001-1983 RE TW IM Rehabilitate Taxiway 7/21/1983 10/14/1987 $9,673
1983 3-02-0235-001-1983 ST OT IM Improve Airport Drainage 7/21/1983 10/14/1987 $109,058
1983 3-02-0235-001-1983 ST RW LI Install Runway Lighting 7/21/1983 10/14/1987 $406,895
1983 3-02-0235-001-1983 RE AP IM Rehabilitate Apron 7/21/1983 10/14/1987 $71,602
1983 3-02-0235-001-1983 RE RW IM Rehabilitate Runway 6/24 7/21/1983 10/14/1987 $453,157