State of Alaska official logo Skip to main content
dot-seal
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
aasp-logo

OUZINKIE: Airport Needs List

Filter +/-
Needs Funding Source:
Status:
Need Category:
 
ASAP Needs Total:   Short Term Needs Total:
Mid Term Needs Total: Long Term Needs Total:
All Needs Total: Needs in Project Total:
Number of Needs: Number of Needs in Project:
 
Needs List
NeedsPriorityNeed OriginationFunding SourceStatusEstimated CostLast Edit DateLast Verified Date
Building Projects (other than terminals): RC BD SN : Reconstruct Snow Removal Building
Building Projects (other than terminals): RC BD SN : Reconstruct Snow Removal Building
N/A Inspection AIP Draft Need $0 3/9/2026 
Construct Passenger Shelter
Construct Passenger Shelter
Long Community N/A Need Created 2/27/2023 
Construct Toilet Facilities
Construct Toilet Facilities
Long Community N/A Need Created 2/27/2023 
QualityOfLife:Weather Reporting Equipment
Install AWOS
ASAP FAA Initiatives N/A Need Created 8/5/2026 
Apron Projects: RE AP IM : Rehabilitate Apron
Minor Gravel Resurfacing / Dust Palliative
Short M&O AIP Programmed Need $150,000 1/20/2026 
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Loader (Replace 37680)
Mid M&O AIP Programmed Need $550,000 2/7/2025 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Minor Gravel Resurfacing / Dust Palliative
Short M&O AIP Programmed Need $2,000,000 7/21/2026 
Taxiway Projects: RE TW IM : Rehabilitate Taxiway
Minor Gravel Resurfacing / Dust Palliative
Short M&O AIP Programmed Need $50,000 1/20/2026 
Equipment: ST EQ SN: Acquire Snow Removal Equipment
Acquire Grader
Mid M&O AIP Obligated Need $460,000 9/4/2026 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Minor Gravel Resurfacing / Dust Palliative
Short M&O AIP Obligated Need $614,526 7/21/2026 
      Total