NONDALTON: Airport Needs List

Base Information
Owner: ALASKA DOT&PF SOUTHCOAST REGION
NPIAS: 02-0432
Airport Use: Public
Type: Airport
FAA Associated City: NONDALTON
DOT&PF Region: Southcoast
DOT Owned: True
Facility Status: Active
Filter +/-
Needs Funding Source:
Status:
Need Category:
M&O Activity:
 
ASAP Needs Total:   Short Term Needs Total:
Mid Term Needs Total: Long Term Needs Total:
All Needs Total: Needs in Project Total:
Number of Needs: Number of Needs in Project:
 
Needs List
NeedsPriorityNeed OriginationFunding SourceStatusEstimated CostLast Edit DateLast Verified Date
Apply Dust Palliative
Apply Dust Palliative
Short Inspection AIP In Project $0 10/26/2021 
Repair Damaged Lighting
Repair Damaged Lighting
Short Inspection AIP In Project $0 11/29/2018 
Replace Primary and Secondary Wind Cones, Segmented Circle and Retro-Reflective Markers
Replace Primary and Secondary Wind Cones, Segmented Circle and Retro-Reflective Markers
Short Inspection AIP In Project $700,000 1/30/2022 
Replace Runway Lighting
Replace Runway Lighting
Short Inspection AIP In Project $619,158 10/26/2021 
Resurface Runway, Taxiway, Apron, and Safety Areas
Resurface Runway, Taxiway, Apron, and Safety Areas
Short Inspection AIP In Project $5,675,383 1/30/2022 
Excavate Area North of RW 2/20 and 9/27 Intersection to meet Line of Sight Standards
Excavate Area North of RW 2/20 and 9/27 Intersection to meet Line of Sight Standards
Long Inspection AIP Need Created $218,545 8/9/2023 
Other Projects: OT CC OB : Remove Obstructions
Brush Cutting
Short Other AIP Need Created $0 4/7/2026 
Construct Passenger Shelter
Construct Passenger Shelter
Long Community N/A Need Created 9/12/2022 
Construct Toilet Facilities
Construct Toilet Facilities
Long Community N/A Need Created 9/12/2022 
Replace Loader
Replace Loader
Short M&O AIP Obligated Need $500,000 10/5/2023 
Equipment, Security, and Fencing: RC EQ SN : Reconstruct Snow Removal Equipment
Replace Grader
Short M&O AIP Programmed Need $460,000 1/20/2026 
      Total