Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

MERTARVIK: AIP Grants

Base Information
Owner: ALASKA DOT&PF CENTRAL REGION
NPIAS: 02-0194
Airport Use: Public
Type: Airport
FAA Associated City: MERTARVIK
DOT&PF Region: Central
DOT Owned: True
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 11
Total Number of Grant Work Codes: 27 Total Grants: $36,754,664.28
Total Number of Open Grant Work Codes: 10 Total Open Grants: $30,583,477.00
Total Number of Closed Grant Work Codes: 17 Total Closed Grants: $6,171,187.28
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2021 3-02-0487-002-2021 ST RW IM Construct Runway 12/30 5/24/2021 $13,997,015
2021 3-02-0487-002-2021 ST TW IM Construct Taxiway 5/24/2021 $621,054
2021 3-02-0487-002-2021 ST AP IM Construct Apron 5/24/2021 $2,758,098
2021 3-02-0487-002-2021 ST GT AC Construct Access Road 5/24/2021 $444,226
2021 3-02-0487-002-2021 ST RW LI Construct Runway Lighting 5/24/2021 $565,334
2021 3-02-0487-002-2021 ST TW LI Construct Taxiway Lighting 5/24/2021 $212,925
2021 3-02-0487-002-2021 ST BD SN Construst Two Snow Removal Equipment Buildings 5/24/2021 $3,407,562
2021 3-02-0487-002-2021 ST OT IN Install Miscellaneous NAVAIDS 5/24/2021 $577,263
2021 3-02-0487-003-2021 ST GT AC Construct Access Road Embankment 2/18/2021 $7,604,300
2021 3-02-0487-003-2021 ST LA DV Acquisition of Parcels 1,2,3,6 and E-4, E-5 2/18/2021 $395,700
2017 3-02-0194-005-2017 RE AP IM Rehabilitate Apron Rehabilitate Apron (Maintenance) 7/25/2017 7/8/2021 2/2/2022 $133,930
2017 3-02-0194-005-2017 RE RW IM Rehabilitate Runway 15/33 Rehabilitate Runway (Maintenance) 7/25/2017 7/8/2021 2/2/2022 $2,080,000
2017 3-02-0194-005-2017 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway (Maintenance) 7/25/2017 7/8/2021 2/2/2022 $130,000
2017 3-02-0487-001-2017 EN PL MA Conduct Environmental Study Feasibility study of material quantity and source 7/19/2017 4/5/2021 $73,743
2009 3-02-0194-004-2009 PL PL MA Conduct Airport Master Plan Study Conduct phase 4 of AMP for additional geotechnical, environmental data gathering, scoping and ALP. 8/10/2009 2/24/2015 $356,195
2007 3-02-0000-008-2007 PL PL MS Conduct Miscellaneous Study Conduct Geotechnical Investigation 9/4/2007 3/21/2012 $306,716
2006 3-02-0194-003-2006 PL PL MA Conduct Airport Master Plan Study (Collection of Wind Data) 9/5/2006 2/27/2012 $97,792
2005 3-02-0200-050-2005 ST EQ SN [Various Grant] Acquire Snow Removal Equipment (Motor Grader & Dozer) 8/19/2005 12/19/2013 $213,539
2005 3-02-0200-052-2005 RE RW IM [Various Grant] Rehabilitate Runway 15/33 (Maintenance) 8/30/2005 6/9/2010 $10,000
2004 3-02-0194-002-2004 PL PL MA Conduct Airport Master Plan Study 8/27/2004 9/19/2008 $90,001
1994 3-02-0194-001-1994 RE RW IM Rehabilitate Runway 15/33 9/27/1994 8/3/2000 $1,388,079
1994 3-02-0194-001-1994 ST LA DV Acquire Land for Development 9/27/1994 8/3/2000 $140,625
1994 3-02-0194-001-1994 ST EQ SN Acquire Snow Removal Equipment 9/27/1994 8/3/2000 $149,250
1994 3-02-0194-001-1994 ST AP CO Construct Apron 9/27/1994 8/3/2000 $108,703
1994 3-02-0194-001-1994 ST RW IM Extend Runway 15/33 9/27/1994 8/3/2000 $579,844
1994 3-02-0194-001-1994 OT GT AC Improve Access Road 9/27/1994 8/3/2000 $62,813
1994 3-02-0194-001-1994 ST BD SN Improve Snow Removal Equipment Building 9/27/1994 8/3/2000 $249,957