KENAI MUNI: AIP Grants

Base Information
Owner: CITY OF KENAI
NPIAS: 02-0142
Airport Use: Public
Type: Airport
FAA Associated City: KENAI
DOT&PF Region: ---
DOT Owned: False
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 75
Total Number of Grant Work Codes: 105 Total Grants: $85,878,955.00
Total Number of Open Grant Work Codes: 24 Total Open Grants: $27,223,499.00
Total Number of Closed Grant Work Codes: 81 Total Closed Grants: $58,655,456.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2024 3-02-0142-075-2024 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Safety Equipment $34,950
2024 3-02-0142-076-2024 SA BD IM Improve/Modify/Rehabilitate ARFF Building $525,925
2024 3-02-0142-077-2024 PL MA UP Update Airport Master Plan $718,045
2024 3-02-0142-078-2024 ST EQ SN Acquire Snow Removal Equipment $1,179,884
2022 3-02-0142-070-2022 CV RG GN General ARPA 1/24/2022 $1,719,887
2022 3-02-0142-071-2022 CV RG LC Large Concessions 1/25/2022 $16,318
2022 3-02-0142-071-2022 CV RG SC Small Concessions 1/25/2022 $65,273
2022 3-02-0142-072-2022 RC OT MS Reconstruct Perimeter Fencing not Required by 49 CFR 1542 9/22/2022 $15,000
2022 3-02-0142-072-2022 ST EQ SN Acquire Snow Removal Equipment 9/22/2022 $125,625
2021 3-02-0142-065-2021 ST BD SN Construct/Rehabilitate/Modify/Expand Sand and Chemical Storage Building 5/19/2021 $881,161
2021 3-02-0142-066-2021 CV CR GN CRRSA Act Funds 3/18/2021 $1,282,977
2021 3-02-0142-067-2021 CV CR CN CRRSA Act Concessions 3/18/2021 $20,398
2021 3-02-0142-068-2021 ST EQ SN Acquire Snow Removal Equipment 9/1/2021 $742,292
2021 3-02-0142-069-2021 SA RW SF Construct/Extend/Improve Safety Area 9/21/2021 $530,945
2020 3-02-0142-063-2020 ST LA SZ Acquire Land For Approaches 9/11/2020 $24,656
2020 3-02-0142-061-2020 ST EQ SN Acquire Snow Removal Equipment 9/2/2020 $249,469
2020 3-02-0142-062-2020 CV CA RE CARES Act Funds 5/11/2020 $0
2020 3-02-0142-064-2020 ST BD SN Construct/Rehabilitate/Modify/Expand Sand and Chemical Storage Building 9/24/2020 $1,831,970
2019 3-02-0142-059-2019 ST OT RF Construct Aircraft Rescue & Fire Fighting Training Facility Acquire ARFF Vehicles for the Regional ARFF Training Facility (one 1,500-gallon and one 3,000-gallon) 9/23/2019 $1,500,000
2019 3-02-0142-059-2019 ST OT RF Construct Aircraft Rescue & Fire Fighting Training Facility REHAB REGIONAL ARFF TRAINING FACILITY 9/23/2019 $4,271,020
2019 3-02-0142-058-2019 RE AP IM Rehabilitate Apron Repair, crack seal, seal coat, remark 7/10/2019 $185,568
2019 3-02-0142-058-2019 RE RW IM Rehabilitate Runway 02L/20R Airfield Marking, Crack- Sealing, and Minor Pavement Rehabilitation 7/10/2019 $255,669
2019 3-02-0142-058-2019 RE TW IM Rehabilitate Taxiway Repair, crack seal, seal coat, remark 7/10/2019 $426,472
2018 3-02-0142-060-2018 ST TE IM Rehabilitate Terminal Building Terminal Building Rehab - Roof/Sprinkler, Interior Passenger Access, and Utilities - Construct 9/19/2018 $10,619,995
2017 3-02-0142-056-2017 ST TE IM Rehabilitate Terminal Building Terminal Building Rehabilitation - Phase 1 Design 9/7/2017 6/6/2019 $488,444
2017 3-02-0142-057-2017 ST EQ SN Acquire Snow Removal Equipment Acquire snow removal equipment to replace end of life loader and multipurpose unit. 7/20/2017 2/8/2019 $922,975
2016 3-02-0142-055-2016 ST OT IM Improve Airport Drainage Float pond spillway improvement; and Restore Storm Drain along RSA 9/12/2016 3/7/2019 $387,921
2016 3-02-0142-053-2016 RE AP IM Rehabilitate Apron Rehab Aircraft Tiedown Apron incl. lighting 5/25/2016 8/15/2018 $544,971
2016 3-02-0142-054-2016 RE RW IM Rehabilitate Runway 01L/19R Paint RW centerlines, including crack-sealing. (7,135 feet Runway Marking and Crack-Sealing) 8/11/2016 9/21/2018 $218,888
2016 3-02-0142-054-2016 RE TW IM Rehabilitate Taxiway Paint TW centerlines and hold lines, including crack-sealing and signage (in association with RWY redisignation). (17,304 feet Taxiways Marking and Crack-Sealing; Install/Replace 10 Signs) 8/11/2016 9/21/2018 $312,155
2016 3-02-0142-053-2016 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway F, G, H -- 2009 PCI = 25-54 -- Inc. lighting 5/25/2016 8/15/2018 $1,532,014
2014 3-02-0142-051-2014 ST EQ SN Acquire Snow Removal Equipment Replace OSHKOSH Truck 7/18/2014 5/12/2016 $499,749
2013 3-02-0142-050-2013 SA OT OB Remove Obstructions Obstruction Clearing 7/11/2013 1/20/2015 $449,706
2013 3-02-0142-049-2013 RE RW IM Rehabilitate Runway 01L/19R Airfield Remarking Project 9/19/2013 12/7/2015 $270,263
2013 3-02-0142-052-2013 PL PL MA Update Airport Master Plan Study Conduct Airport Master Plan, Phase 2 -- Conduct aeronautical survey 9/12/2013 8/22/2018 $170,680
2011 3-02-0142-047-2011 PL PL WH Wildlife Hazard Assessments 3/14/2011 1/20/2015 $107,286
2011 3-02-0142-048-2011 ST EQ SN Acquire Snow Removal Equipment Acquire SRE, FY 11 Phase 2: Tow Broom 8/25/2011 3/25/2013 $768,843
2011 3-02-0142-046-2011 ST EQ SN Acquire Snow Removal Equipment Acquire SRE, FY11 Phase 1: Grader/Loader 3/14/2011 3/7/2013 $826,101
2010 3-02-0142-044-2010 ST AP CO Construct Apron Float Plane Basin Development, Phase 1 8/13/2010 1/7/2015 $197,049
2010 3-02-0142-045-2010 PL PL MA Conduct Airport Master Plan Study Supplemental Master Plan 7/23/2010 5/12/2016 $531,608
2009 3-02-0142-039-2009 ST EQ SN Acquire Snow Removal Equipment Acquire Plow Truck Attachment 2/2/2009 5/4/2010 $51,841
2009 3-02-0142-040-2009 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle Acquire ARFF Truck 2/12/2009 6/13/2011 $843,698
2009 3-02-0142-041-2009 RE AP IM Rehabilitate Apron Rehab Apron, Phase 1 (Design and Construction Block 1, FY09 Part A) 2/2/2009 3/13/2013 $825,183
2009 3-02-0142-042-2009 RE AP IM Rehabilitate Apron Rehab Apron, Phase 2 (Design and Construction Block 1, FY09 Phase B) 6/22/2009 3/13/2013 $4,695,818
2009 3-02-0142-043-2009 RE AP IM Rehabilitate Apron Apron Rehabilitation - (2009 ARRA funded) 5/18/2009 12/10/2010 $0
2008 3-02-0142-038-2008 ST BD SN Construct Sand and Chemical Storage Building Construct Sand/Urea Bldg 6/11/2008 8/12/2009 $432,436
2007 3-02-0142-037-2007 RE RW IM Rehabilitate Runway 01L/19R rehab. runway 1/19 & provide RSA (phase 3) 4/20/2007 6/21/2010 $2,883,345
2007 3-02-0142-037-2007 ST SB CO Improve Seaplane Base extend & widen waterlane (phase 2b) 4/20/2007 6/21/2010 $1,027,567
2006 3-02-0142-035-2006 ST SB CO Improve Seaplane Base extend & widen waterlane (phase 1) 7/24/2006 8/28/2009 $383,763
2006 3-02-0142-035-2006 ST SB CO Improve Seaplane Base extend & widen waterlane (phase 2a) 7/24/2006 8/28/2009 $1,200,000
2006 3-02-0142-035-2006 RE RW IM Rehabilitate Runway 01L/19R Rehabilitate runway lighting 7/24/2006 8/28/2009 $348,566
2006 3-02-0142-035-2006 RE RW IM Rehabilitate Runway 01L/19R RSA, provide standard(Phase 2) 7/24/2006 8/28/2009 $2,500,000
2006 3-02-0142-035-2006 RE RW IM Rehabilitate Runway 01L/19R (Phase 2) 7/24/2006 8/28/2009 $5,261,277
2005 3-02-0142-034-2005 ST TW IM Extend Taxiway (Multi-Year, Year 2) 5/24/2005 4/10/2007 $364,079
2005 3-02-0142-034-2005 ST TW IM Extend Taxiway Extend Twy P 5/24/2005 4/10/2007 $1,677,996
2004 3-02-0142-033-2004 ST EQ SE Security Enhancements 8/30/2004 2/14/2007 $506,666
2004 3-02-0142-032-2004 PL PL MA Update Airport Master Plan Study 8/25/2004 4/14/2008 $350,498
2003 3-02-0142-031-2003 OT GT AC Improve Access Road (ADA Access) 8/21/2003 5/22/2007 $955,086
2003 3-02-0142-031-2003 ST TE MS Acquire Handicap Passenger Lift Device 8/21/2003 5/22/2007 $30,937
2002 3-02-0142-028-2002 ST EQ SN Acquire Snow Removal Equipment (loader, sander/truck unit) 9/19/2002 6/30/2004 $206,923
2002 3-02-0142-030-2002 ST RW IM Extend Runway (Environmental) Phase 1 9/19/2002 8/1/2006 $188,359
2002 3-02-0142-030-2002 SA RW SF Extend Runway Safety Area (Environmental) Phase 1 9/19/2002 8/1/2006 $167,821
2002 3-02-0142-029-2002 SE SE SE Security Enhancements 9/19/2002 4/21/2006 $319,514
2001 3-02-0142-027-2001 SA BD EX Improve Aircraft Rescue & Fire Fighting Building 4/16/2001 2/24/2005 $4,062,263
2000 3-02-0142-026-2000 SA BD EX Improve Aircraft Rescue & Fire Fighting Building 8/4/2000 8/27/2004 $671,853
1999 3-02-0142-025-1999 ST EQ SN Acquire Snow Removal Equipment 3/24/1999 6/12/2000 $267,816
1998 3-02-0142-024-1998 ST OT RF Construct Aircraft Rescue & Fire Fighting Training Facility 4/29/1998 9/26/2000 $2,200,000
1997 3-02-0142-022-1997 ST RW CO Construct Runway 1R-19L 7/8/1997 12/6/2000 $303,482
1997 3-02-0142-022-1997 ST TW IM Extend Taxiway 7/8/1997 12/6/2000 $1,233,832
1997 3-02-0142-023-1997 ST OT RF Construct Aircraft Rescue & Fire Fighting Training Facility 12/17/1997 9/26/2000 $6,070,889
1997 3-02-0142-023-1997 ST OT RF Construct Aircraft Rescue & Fire Fighting Training Facility 12/17/1997 9/26/2000 $3,354,094
1995 3-02-0142-020-1995 PL PL MA Conduct Airport Master Plan Study 6/5/1995 8/15/2000 $281,155
1995 3-02-0142-021-1995 ST EQ SN Acquire Snow Removal Equipment 4/25/1995 10/24/1998 $197,847
1994 3-02-0142-019-1994 ST EQ SN Acquire Snow Removal Equipment 6/22/1994 6/1/1995 $207,943
1994 3-02-0142-018-1994 SA OT SG Install Airfield Guidance Signs 6/20/1994 1/12/1996 $34,888
1993 3-02-0142-017-1993 SA EQ SE Acquire Security Equipment 7/13/1993 12/13/1994 $79,510
1993 3-02-0142-014-1993 ST EQ SN Acquire Snow Removal Equipment 12/2/1992 11/15/1993 $172,678
1993 3-02-0142-015-1993 ST EQ SN Acquire Snow Removal Equipment 1/28/1993 11/22/1993 $242,944
1993 3-02-0142-016-1993 RE TW IM Rehabilitate Taxiway 6/15/1993 12/20/1994 $172,926
1992 3-02-0142-013-1992 SA EQ SE Acquire Security Equipment 9/8/1992 12/22/1994 $137,376
1992 3-02-0142-012-1992 ST RW SF Improve Runway Safety Area 1/19 5/28/1992 1/10/1996 $1,452,816
1991 3-02-0142-011-1991 SA EQ RF Acquire Aircraft Rescue & Fire Fighting Vehicle 9/9/1991 10/13/1992 $270,832
1991 3-02-0142-010-1991 ST LA DV Acquire Land for Development 8/7/1991 10/9/1991 $147,611
1991 3-02-0142-009-1991 ST EQ SN Acquire Snow Removal Equipment 9/10/1991 11/17/1992 $96,383
1990 3-02-0142-008-1990 ST TW CO Construct Taxiway 8/23/1990 2/28/1991 $230,368
1989 3-02-0142-007-1989 RE RW IM Rehabilitate Runway 1 8/23/1989 12/4/1990 $687,838
1989 3-02-0142-006-1989 PL PL MS Conduct Miscellaneous Study 4/21/1989 11/17/1992 $53,242
1989 3-02-0142-007-1989 RE TW IM Rehabilitate Taxiway 8/23/1989 12/4/1990 $193,523
1989 3-02-0142-007-1989 RE RW LI Rehabilitate Runway Lighting 8/23/1989 12/4/1990 $146,980
1988 3-02-0142-005-1988 RE TW IM Rehabilitate Taxiway 9/14/1988 4/11/1990 $247,384
1987 3-02-0142-004-1987 ST RW CO Construct Runway 01/19 8/27/1987 4/20/1990 $576,367
1987 3-02-0142-004-1987 SA EQ SE Acquire Security Equipment 8/27/1987 4/20/1990 $26,219
1987 3-02-0142-004-1987 OT GT AC Improve Access Road 8/27/1987 4/20/1990 $42,768
1987 3-02-0142-004-1987 ST TW CO Construct Taxiway 8/27/1987 4/20/1990 $63,234
1987 3-02-0142-004-1987 ST TW CO Construct Taxiway 8/27/1987 4/20/1990 $18,592
1987 3-02-0142-004-1987 ST TW CO Construct Taxiway 8/27/1987 4/20/1990 $7,433
1986 3-02-0142-003-1986 CA TW CO Construct Taxiway 9/9/1986 2/4/1988 $60,570
1986 3-02-0142-003-1986 ST AP LI Install Apron Lighting 9/9/1986 2/4/1988 $30,937
1986 3-02-0142-003-1986 RE AP IM Rehabilitate Apron 9/9/1986 2/4/1988 $269,766
1986 3-02-0142-003-1986 RE RW IM Rehabilitate Runway 1/19 9/9/1986 2/4/1988 $336,562
1985 3-02-0142-002-1985 PL PL MA Conduct Airport Master Plan Study 9/25/1985 4/19/1988 $67,060
1983 3-02-0142-001-1983 CA AP CO Construct Apron 9/28/1983 1/17/1986 $236,208
1983 3-02-0142-001-1983 ST EQ MS Acquire Aircraft Rescue & Fire Fighting Safety Equipment 9/28/1983 1/17/1986 $12,375
1983 3-02-0142-001-1983 RE AP IM Rehabilitate Apron 9/28/1983 1/17/1986 $214,116
1983 3-02-0142-001-1983 ST AP LI Install Apron Lighting 9/28/1983 1/17/1986 $24,750